User's Manual
Operation
Initial Syste
m Setup
1. Change optional setup selections to
desired parameters, as described in
Setup Mode Screens, page 38.
2. Set recipe and flush information as
described in Recipe Screen, page 45 and
Flush Screen, page 47.
Prime and Fill the System
NOTE: See Ru
n Mode Screens, page 31,forfurther
screen inf
ormation, if needed.
NOTE: Be sure the mix manifold is set to the SPRAY
position.
NOTE: You must prime the input lines to the pumps
or the inputs to the color change valves before
priming the pump and filling the entire system.
1. If using an electrostatic gun, shut off the
electrostatics before filling the lines.
2. Adjust the main air pressure. To ensure proper
operation, set the main air pressure as close to
100 psi (0.7 MPa, 7.0 bar) as possible. Do not
use less than 85 psi (0.6 MPa, 6.0 bar).
3. If this is the first time starting up the system, or if
lines may contain air, purge as instructed under
Purging, page 27. The equipment was tested
with lightweight oil, which should be flushed out
to avoid contaminating your material.
4. If the system is powered down, press
on the
ADM. Make sure that the system is in Standby
mode.
5. Verify that the recipes and the flush sequences
are programmed correctly by checking
the Recipe Screen, page 45 and the
Flush Screen, page 47.
6. Go to the Fill Screen, page 35.
7. Select the desired color to load. Press the Prime
Pump key
. The color will load the pump
through the color stack and out the outlet stack
dump valve.
NOTE: Inasinglecolorsystem,skipstep7and
prime the pump out to the gun.
8. Press the Fill Line key
to run color out to
the mix manifold. The pump will run until you
press the Stop key
to stop the pump.
9. Trigger the gun into a grounded metal pail until
the line is full, then press the Stop key
.
10. Repeat for all material lines.
332562B 25