User's Manual

Installation
6 332453C
Calibration Check Assembly,
24R777
1. Perform the Shutdown procedure in the Exact-
aBlend AGP Advanced Glazing Proportioner,
Setup-Operation manual.
2. Install the hose clamps onto the boom assembly.
Hand tighten all hose clamps. Refer to Calibration
Check Assembly, 24R777, page 14, for correct
screw locations.
NOTE: The base material tube is 0.5 in. (1.3 cm) in
diameter. Verify the hose clamps are installed on the
correct side of the boom assembly.
3. Remove the pressure gauges and fittings.
4. Install the tube fittings. Tighten the fittings to prevent
leaking.
5. Install the material tube lines onto the boom assem-
bly. Tighten all fittings to prevent leaking.
6. Install the check valve assembly onto the tube lines.
Tighten all fittings to prevent leaking.