User's Manual

Installation
332453C 3
Installation
Light Tower, 24R824
1. Perform the Shutdown procedure in the Exact-
aBlend AGP Advanced Glazing Proportioner,
Setup-Operation manual.
2. Remove the rear nut that secures the fluid plate.
3. Fasten the light tower bracket to the boom assem-
bly. Torque the nut to 24 ft-lb (33 N•m).
4. Mount the light tower to the bracket. Hand tighten
the light tower nut.
5. Connect the cable from the light tower to port 5
located on the Fluid Control Module (FCM).
NOTICE
To avoid machine damage or injury, do not remove
both bolts.