User's Manual
SmartDie
™
 Screed Box
313787C 13
SmartDie
™
 Screed Box 
Installation
1. Shut off the SmartDie
™
 screed box IR burner.
2. Open screed shroud door.
3. Move SmartDie
™
 screed box actuator out of full 
raised locked position.
4. Slide SmartDie
™
 screed box under screed shroud 
and press down on SmartDie
™
 lever. 
5. Engage SmartDie
™
 screed box rod into SmartDie
™
lever.
6. Align hole of rod clevis with connecting hole in 
SmartDie
™
 screed box yoke and install hairpin cot-
ter pin.
7. Close and lock screed shroud door.
8. Re-light SmartDie
™
 screed box IR burner as 
required. 
Removal
1. Shut off SmartDie
™
 screed box IR burner.
2. Open screed shroud door.
Use extreme caution when installing and removing 
screed box. Expect all equipment components and 
material to be extremely hot. See MSDS for Thermo-
plastic Traffic Marking Compound.
ti14126a
ti14140a
ti14267a
ti14271a
ti14268a
ti14155a
ti14126a
ti14140a










