User's Manual

Installation
313599P 7
Location
ProMix 2KS/2KE/3KS and ProControl 1KS
The meter measures the flow at the location it is
installed, so install the flow meter as close as possi-
ble to the proportioner component A or B dispense
valve.
The meter must be located within 20 ft. (6.1 m) of
the proportioner fluid panel. The Graco-provided
meter signal cable assembly (4) must be used. No
substitution is allowed. See F
IG. 6 on page 10.
Informer and ProControl 1KE
The meter must be located within 50 ft. (6.1 m) of the
proportioner fluid panel. The Graco-provided meter sig-
nal cable assembly (4) must be used. No substitution is
allowed. See F
IG. 10 on page 14
Mounting
NOTE: Model 258151 Meter includes two 2-piece
mounting brackets and screws. See Mounting Hole
Dimensions on page 28 to install.
No other special fittings or brackets are required. Exter-
nal vibration will not affect meter accuracy.
NOTE: The transmitter housing, with the display, can be
rotated for better viewing. See the Endress+Hauser
Instruction Manual for details.
Vertical Mounting
NOTE: Do not mount the meter so the fluid line runs
horizontally across the vertical mounting surface.
Fluid Flow Upward - preferred method
Mounting so fluid flow is upward through the meter is
preferred as this allows solids to settle out and air to rise
away from metering tube. See F
IG. 1.
Install the check valve provided at the meter inlet to min-
imize pulsation and backflow from the fluid supply.
NOTICE
See Technical Data on page 29 for the weight of your
meter. The meter is heavy and must be properly sup-
ported to avoid stress on the fluid connections.
TI0850a
FIG. 1. Fluid Flow Upward
FlowFlow
check valve
TI4937a