User's Manual
309024 23
Service
NOTE: Refer to Fig. 14 for steps 4 to 10.
4. Push down on the lever arm (49) until the wrench
flats (KK) on the secondary pump (124) are just
above the wet-cup (LL). Remove the ratio index
clamp capscrews (16a) and the index clamp (30).
NOTE: Some fluid will drip from the pump when you
are removing the ratio index clamp.
5. Raise the lever arm (49) off the pivot pin
support (31a).
6. Remove the connecting rod cotter pin (102), if the
pump has one. Unscrew the connecting rod
assembly (117, 14a, 34a, 31a) in one piece from
the pump.
7. If you are removing only the pump, remove it from
the inlet manifold (32). If the secondary pump(s)
need repair, follow the instructions in its manual.
8. If you are removing the bearings and pins, tilt the
secondary pump (124) forward until it rests on the
floor. Then follow Steps 9 and/or 10.
9. If you are removing the upper bearing (14a) and
support pin:
a. Loosen the two setscrews (17a). Back out the
setscrews far enough to clear the countersinks
of the support pin (34a).
b. Place the support (31a) in a vise. Unscrew the
connecting rod (117) from the bearing (14a).
The connecting rod and bearing are sealed
with thread sealant and may be difficult to
unscrew.
c. Remove the support (31a) from the vise.
Gently tap the support pin (34a) out with a
hammer and punch.
d. Replace the support pin and bearing.
10. If removing the lower bearing (14b) and support
pin (34b):
a. Remove one of the lower clamps (28) and
capscrews (16b).
b. Loosen the locknut (3) and screw the pump
manifold (32) off the bearing (14b) to remove
the secondary displacement pump (124).
c. Remove the remaining clamp (28) and cap-
screw (16b) from the lower support (31b).
d. Raise the VRHC lower frame (50) and remove
the support (31b).
e. Gently tap the support pin (34b) out with a
hammer and punch.
f. Replace the pin and bearing.
Fig. 14
02374
16a
30
49
17a
31a
34a
117
102
KK
LL
124
32
16b
28
50
3
14b
31b
34b
17b
14a