Operation
Startup
WARNING
INJECTION HAZARD
To reduce the risk of serious injury,
follow the Pressure Relief Procedure
on page 19 whenever you are instructed
to relieve the pressure.
Never exceed the maximum air and fluid working
pressure of the lowest rated component in your
system. See Equipment Misuse Hazard, page 4.
1. Install full containers of resin and hardener at the
feed pumps.
2. To prime the system, follow Steps 2 to 11 of the
Flushing procedure on page 17.
3. Turn on the heaters, if used, and allow them to
warm up for 10 minutes.
4. Open the feed pump air valves (A1,A2). Adjust the
air regulators (E1,E2) just enough to start the
pumps operating slowly.
5. Open the proportioning pump air valve (A3) and
slowly open the regulator (E3) to start the propor-
tioning pump.
6. Open the mixer manifold (N) and trigger the
dispense valve (S).
7. Set the air pressure to the feed pumps at 88 psi
(605 kPa, 6 bar) or 25% of proportional pressure at
the fluid outlets, whichever is less. Use the gauges
(J1) to monitor this pressure. Higher pressures
may prevent the proportioning pump inlet ball
checks from setting properly.
8. Set the air pressure to the proportioning pump (H)
to obtain the required fluid pressure. Refer to the
proportioning pump chart on page 6 for the fluid
to air pressure.
9. While triggering the dispensing valve, check the
fluid outlet pressure gauges (J2) and make note of
the pressures indicated. Check the gauges
frequently during operation. These notes will help
to analyze any problems that may occur since a
change in displacement pump performance will be
indicated by a change in pressure gauge readings.
NOTE: A pressure drop does occur during pump
stroke changeover.
NOTE: Flush the mixer manifold frequently during the
day’s operation. Follow Step 11 on page 17.
02913
Fig. 17
KEY
A Bleed-type master air valve
A1 Hardener feed pump
A2 Resin feed pump
A3 Proportioning pump
E Pump air regulator
E1 Hardener feed pump
E2 Resin feed pump
E3 Proportioning pump
J Fluid pressure gauge
J1 Proportioning pump intake
J2 Proportioning pump outlet
H Proportioning pump
N Mixer manifold
S Dispensing valve
V Fluid strainer
A1
E1
A3
E3
A2
E2
H
J1
J2
N
S
V