Product Manual
4
Install a thermal relief valve or
other
wise allow for thermal
expansion
oftheuid.
Priortoinstallation,determinethetting
angle desired and whether horizontal
or vertical orientation is required. See
Illustrated Parts List for assembly details.
Rotate Fittings
To rotate inlet and/or outlet fittings,
remove the two nuts and bolts that
secureeachtting.Rotatethettingto
the desired orientation. Whether install-
ing or rotating fittings, make sure the
O-ring is fully seated and the strainer is
installed in the inlet opening of the meter
body. Torque the nuts and bolts to 60-72
in-lb (recommended) or until tight.
Change Meter/Cover Orientation
1. Remove the two screws that
hold the cover in place and
remove the cover (Figure 1).
Figure 1
2. You can now rotate the entire meter
body or the cover to the desired
orientation without further disas-
sembly. Reassemble the cover in
the desired rotational position and
tighten the screws. The cover will
tinanyoffourrotationalpositions
around the front of the meter body
without affecting meter operation or
accuracy.
Meter Installation
1. Remove protective plugs from the
meter inlet and outlet ports and
installinlet/outletttings.
2. Wrap any threaded male connec-
tions with thread tape or use a pipe
sealant compound compatible with
petroleum fuels. We recommend
thread sealant approved for
ammableliquidsattheinlettting
in horizontal orientation.
3. Install the meter on the pump using
an appropriately sized nipple. The
meter’s flow path is marked on
the housing exterior with an arrow
pointing toward the outlet port.
4. Install other system components on
the meter and tighten.
To ensure accurate measurement,
remove all air from the system before
use. It is strongly recommended that
accuracy be verified prior to use. To
do this, remove all air from the system,
measure an exact known volume
into an accurate container, and verify
the volume against the readout or
recording equipment. If necessary,
use a correction factor to figure final
volume. For best results, accuracy
shouldbeveriedperiodicallyaspart
of a routine maintenance schedule.
OPERATION
ALWAYS FOLLOW SAFETY
PREC
AUTIONS WHEN OPERATING
THISEQUIPMENT.REVIEWTHE
SAFETY INSTRUCTIONS.
Before use, visually check the meter
to ensure it is securely connected to
other system components and there
is no leakage. Promptly wipe spilled
fuel from the meter’s exterior and other
system components.