INSTALLATION INSTRUCTIONS EVO-SQ xLay-in panel T-bar ceiling: 1. Cut ceiling opening slightly larger than the outside opening of the mounting frame. 2. Position mounting frame through opening in ceiling. 3. Once mounting frame has been secured in structure, adjust the mounting frame vertically to align the bottom edge to either flush or slightly above (1/8" max) the ceiling line (see Figure 3).