Operation Manual

GMC-I Messtechnik GmbH 39
15.3 Configuring Measuring Parameters
Depending upon the test regulation, various measuring parameters can
be configured for the test sequence (settings: x / – = function activated /
deactivated). All of the possible parameters for all of the regulations are
listed below. The Sequence... menu is accessed via the setup parameter in
the initial program window for the respective regulation.
Select the Sequence... menu and acknowledge.
Select a parameter, acknowledge, change and acknowledge the change.
Visual inspection This menu appears at the very beginning of the test
sequence.
Manual sequence Each test step must be acknowledged with the
key (see test sequence in chapter 8 on page 18
regarding test duration for automatic sequence).
Autostore After testing is completed, test data are automatically
stored to the test instrument (Feature KB01 or SECUT-
EST SIII+H), or in the (P)SI module (accessory).
Mains polarity
reversal L an N are reversed each time line voltage is applied
to the test socket.
Classification Questions regarding classification appear if limit
values are exceeded, see chapter 5 on page 15.
SC III U
V
Supply voltage is measured instead of insulation
resistance for active devices under test.
R-INS LN-PE Insulation resistance measurement is performed
between phase and neutral conductors, and the
protective conductor.
R-INS AP-PE Insulation resistance measurement is performed from
an application part to the protective conductor.
HV test A high-voltage test is performed
(prerequisite: Feature F02 or SECUTEST SIII+H
)
HV test duration Duration of a high-voltage test (5 ... 60 s)
Auto (test) method The instrument recognizes whether or not the device
under test can be switched on:
Leakage or residual current, or insulation resistance
and earth leakage current are measured accordingly.
R-PE AC > 10 A
Protective conductor measurement with 200 mA DC
,
10 A AC
(feature G00
)
oder 25 A AC
(
feature
G01 or
SECUTEST SIII+H)
R-PE with clip Protective conductor resistance can be determined
with the help of the WZ12C current clip
No I
HL
for SCI Housing leakage current is not tested for SCI.
Mains wait A waiting period between switching mains power on
and starting the test can be entered here, e.g. in
order to suppress the display of recorded values
which occur during warm-up of the device under
test.
Patient auxiliary
current Measurement is performed with patient auxiliary
current
Adapter for socket Limit values are activated for permanently connected
devices. A device under test which is normally per-
manently installed can be connected to the test
socket via an adapter. No voltage may be applied to the
test socket when this test method is used.
First measured
values A menu for the entry of the first measured value
appears during the test sequence.