Operation Manual
GMC-I Messtechnik GmbH 99
Automatic Test – Administration
Test Step Specification – Multiple Measurement
Several measuring points can be acquired from a single DUT with
these measurements.
Measurement is started as a continuous measurement. Three
buttons can be used during the measurement, namely “Accept”,
“End Test Step” and “Abort”. The current measured value is
accepted as the test result with the “Accept” button. However,
measurement continues so that an additional measured value can
be accepted by pressing the “Accept” button once again.
Measurement can be ended with the “End Test Step” button, after
which the next test is started. The sequence can be stopped with
the “Abort” button. The measured values for the individual mea-
suring points are listed in a special window, one after the other.
The results of the test step are determined on the basis of these
values and are always based on the worst of all measured values.
Test Step Specification – Visual Inspection
A visual inspection prompts the test person to visually assess the
device under test. One or a number of test questions can be
answered with “OK” or “Not OK”.
Short-form Operating Instructions
Entering a Visual Inspection
Ð Enter a new test step:
Ð Select visual inspection
General Index Card
Ð Designation: Enter a designation for identification/archiving
Class Visual inspection (pre-selection)
Ð Description: A comment can be entered if required
Visual Inspection Questions Index Card
Ð Select and edit new visual inspection / test instruction
Ð Select add further questions if required
Ð Select and edit new visual inspection question
Ð Change the order of the questions with the keys
if required
Ð Individual questions can be deleted with the symbol