Operation Manual
GMC-I Messtechnik GmbH 75
Automatic Test – Individual Test Sequences
6.3 Preparing and Executing Test Sequences
6.3.1 “Deadlines” Index Card
All of the deadlines entered with the deadline administration func-
tion (section 7.5.2) are listed here provided no pre-selection has
been made for object type, customer or location (“filter function”,
see page 74.)
If a scheduled object has been selected, and if it has only one test
sequence, the “Test” index card is then automatically activated.
The test can be started.
Currently Due Deadline
DUTs whose test deadlines are the same as the day on which the
test system has been switched on appear in blue.
Past Due Deadline
DUTs whose test deadlines are past due appear in red.
Future Deadline
DUTs whose test deadlines are in the future appear in black.
Test Sequence
After execution of the scheduled tests and storage of the test
results to memory, these tests no longer appear in the deadlines
list. Deadlines entered to the test system are not carried forward.
Note
Deadline administration, by means of which deadliness are
carried forward, is only possible at a PC with PS3.
Blue: test due today
test past dueRed:
deadline in the
Black:
future
Filter:
enter preselection