Operation Manual

132 GMC-I Messtechnik GmbH
Appendix
10 Appendix
10.1 Test Sequences
The following flowchart is representative of all test sequences.
The control test sequence is started automatically in the back-
ground, during the course of which all preliminary tests are exe-
cuted which are required for a safe test sequence.
The number and type of test steps varies in the visible part of the test
sequence depending upon which standard has been selected.
How the various test steps included in the test sequences can be
accessed and modified is described in section 7.4.3 (factory de-
fault setting: read only). The test sequences are described in de-
tail in section 7.4.3.
Flow Chart
Probe
2)
connected?
Short-circuit
at DUT?
Yes
Control test sequence in background (safety tests are being executed, schedule checking)
Yes
U < 15 V
1)
Check whenever the test system is connected to mains power.
2)
Check if test steps are included in the sequence for which the probe is required.
U > 15 V
R > 15 k
PE
1)
connected?
R < 15 k
Note:
Touch contact surface (test for hazardous shock voltage)
PE
potential
1)
?
No
R > 3
R < 1.5
No
Start of visible part of the test sequences
U
Mains
?
Testing of operating voltage (if mains connection is required for the test sequence)
U < 200 V
U = 230 V
Switch-on Check
„Please switch on DUT“
can be skipped with NO for DUTs with electronic switch
Abort testing
Abort testing
Abort testing
Abort testing
Abort testing