Operation Manual

GMC-I Messtechnik GmbH 27
SECULIFE DF
BASE
DELAY
This line normally displays the delay from the peak of the R wave until the start of the Defib Energy
pulse. The line is replaced by the CHARGE TIME if this test has been run (see START CHARGE
TIMER SCREEN for more information).
CHG TIME
This line displays if the Charge Timer has been run. It shows the time required to charge the Device
Under Test (DUT). This test is started with the key.