Manual
Table Of Contents
- 1 System requirements for local and client installation
- 2 Versions of IZYTRONIQ
- 3 Downloading BUSINESS and CLOUD Variants
- 4 Initial installation of BUSINESS Starter / Advanced / Professional / Premium
- 5 Initial installation of the ENTERPRISE Variant
- 6 Licensing
- 7 Update
- 8 Uninstallation
- 9 Login / Logout
- 10 Basics of operation
- 11 Home screen
- 12 Main modules
- 12.1 Module for portable objects
- 12.2 Module for stationary objects
- 12.3 Test device management
- 12.4 User management
- 12.5 Recycle bin
- 12.6 Settings
- 12.7 Synchronization (ENTERPRISE Ultimate only)
- 12.8 Help
- 13 Lists
- 14 Print
- 15 Document management
- 16 PUSH/PRINT
- 17 Sequence editor
- 18 Automatic process control for a test – remote function
- 19 Working in multi-user mode (floating license)
- 20 Data replication using the server
- 21 Editing report templates
- 22 SECUTEST/SECULIFE ST – first steps
- 23 PROFITEST – first steps
- 24 METRAHIT – first steps
- 25 NEXONIQ
- 25.1 License – Right of Utilization – Activation
- 25.2 Download
- 25.3 System Requirements of Local and Client Installation
- 25.4 Setup of User Interface
- 25.5 Reading out data from test instruments the formats of which are not compatible with IZYTRONIQ
- 25.6 Data import from ETC file
- 25.7 Importing the converted files into IZYTRONIQ
- 26 VIDEOS – Tutorial
- 26.1 “Sequence editor”Function “Input, change, list” – Portable Objects
- 26.2 Structure of the index cards – portable objects
- 26.3 File import – portable objects
- 26.4 Conflict manager – portable objects
- 26.5 Function “Input, change, list” – stationary objects
- 26.6 Structure of the index cards – stationary objects
- 26.7 Management and creation of test instruments
- 26.8 User management – BUSINESS Version except Premium variant
- 26.9 Global settings
- 26.10 Catalogs
- 26.11 Lists
- 26.12 Generation of test report
- 26.13 Push/Print
- 26.14 Sequence editor
- 26.15 Editing report templates
76 GMC-I Messtechnik GmbH
Example for the e-tree:
The electric tree is active; the socket 01.19 is selected. Therefore, the symbol and text are green and shaded gray. The location tree
now indicates that this socket is situated in room 1.23. The parent objects Südwestpark, High-rise, 1st floor are indicated by the green
symbol, which means it is possible to identify where the socket is located, even when the node is closed.
Example: assignment of the socket
Example for the location tree:
The location tree is active, and room 1.23 is selected Therefore, the symbol and text are green and shaded gray. The electric tree indi-
cates that only the socket 01.19 is located in this room. The parent objects Customer Gossen Metrawatt, House installation, Main dis-
tributor 1, RCD01.00, F01.01 are indicated by the green symbol, which means it is possible to identify that an object belonging to this
parent node is located in the selected room, even when the node is minimized.
Example: objects in room 1.23