Manual
Table Of Contents
- 1 System requirements for local and client installation
- 2 Versions of IZYTRONIQ
- 3 Downloading BUSINESS and CLOUD Variants
- 4 Initial installation of BUSINESS Starter / Advanced / Professional / Premium
- 5 Initial installation of the ENTERPRISE Variant
- 6 Licensing
- 7 Update
- 8 Uninstallation
- 9 Login / Logout
- 10 Basics of operation
- 11 Home screen
- 12 Main modules
- 12.1 Module for portable objects
- 12.2 Module for stationary objects
- 12.3 Test device management
- 12.4 User management
- 12.5 Recycle bin
- 12.6 Settings
- 12.7 Synchronization (ENTERPRISE Ultimate only)
- 12.8 Help
- 13 Lists
- 14 Print
- 15 Document management
- 16 PUSH/PRINT
- 17 Sequence editor
- 18 Automatic process control for a test – remote function
- 19 Working in multi-user mode (floating license)
- 20 Data replication using the server
- 21 Editing report templates
- 22 SECUTEST/SECULIFE ST – first steps
- 23 PROFITEST – first steps
- 24 METRAHIT – first steps
- 25 NEXONIQ
- 25.1 License – Right of Utilization – Activation
- 25.2 Download
- 25.3 System Requirements of Local and Client Installation
- 25.4 Setup of User Interface
- 25.5 Reading out data from test instruments the formats of which are not compatible with IZYTRONIQ
- 25.6 Data import from ETC file
- 25.7 Importing the converted files into IZYTRONIQ
- 26 VIDEOS – Tutorial
- 26.1 “Sequence editor”Function “Input, change, list” – Portable Objects
- 26.2 Structure of the index cards – portable objects
- 26.3 File import – portable objects
- 26.4 Conflict manager – portable objects
- 26.5 Function “Input, change, list” – stationary objects
- 26.6 Structure of the index cards – stationary objects
- 26.7 Management and creation of test instruments
- 26.8 User management – BUSINESS Version except Premium variant
- 26.9 Global settings
- 26.10 Catalogs
- 26.11 Lists
- 26.12 Generation of test report
- 26.13 Push/Print
- 26.14 Sequence editor
- 26.15 Editing report templates
36 GMC-I Messtechnik GmbH
11.1.1 Test deadlines for objects [from BUSINESS Professional]
The dashboard function is shown as an overview diagram and pie chart in each main module.
Overview diagram
The overview shows you the evaluated number of objects belonging to this main module, grouped into 4 categories:
• Symbol in a green square: this means that all the objects listed here are within the individually defined test intervals and that all the
listed objects passed their most recent test
• Symbol in a yellow square: this means that all the objects listed here are inside the individually defined escalation time (1st escalation
level) for testing and that all the listed objects passed their most recent test
• Symbol in an orange square: this means that all the objects listed here are inside the individually defined escalation time (2nd escala-
tion level) for testing and that all the listed objects passed their most recent test
• Symbol in a RED square: this means that all the objects listed here are outside the individually defined test interval, were not tested or
did not pass their most recent test
The matching objects are shown in the filter list by selecting the symbol in the relevant colored square; refer to “Lists”.
Pie chart
The pie chart shows the percentage distribution of the aforementioned categories and the total number of listed objects.
11.1.2 Test deadlines for test devices [from BUSINESS Professional]
This dashboard function shows an overview of the calibration deadlines for test devices.
Overview diagram
The overview shows you the evaluated number of objects belonging to test device management, grouped into 4 categories:
• Symbol in a green square: this means that all the objects listed here are inside the individually defined test intervals and that all the
listed objects passed their most recent test
• Symbol in a yellow square: this means that all the objects listed here are inside the individually defined escalation time (1st escalation
level) for testing and that all the listed objects passed their most recent test
• Symbol in an orange square: this means that all the objects listed here are inside the individually defined escalation time (2nd escala-
tion level) for testing and that all the listed objects passed their most recent test
• Symbol in a RED square: this means that all the objects listed here are outside the individually defined test intervals, were not tested or
did not pass their most recent test
The matching objects are shown in the filter list by selecting the symbol in the relevant colored square; refer to “Lists”.