Operation Manual

GMC-I Messtechnik GmbH 45
4.5.2 Starting the Test
START
After capacitance has been determined, the instrument automati-
cally continues with dielectric discharge testing. This takes about
30 minutes. However, the measurement can be aborted at any
time by pressing the MENU key. Only capacitance is displayed in
this case.
STORE
Press briefly: Save results
Press & hold: Save results and activate the entry field:
A description of the measurement with up to 15
characters can be entered to the information field
at the bottom. See chapter 5.1.1 regarding entry.