User manual

60 GMC-I Messtechnik GmbH
Set measurement duration of individual test steps (as of firmware 1.5.0)
Testing time for the respective measurement can be influenced
with these parameters. If a test step for a single measurement is
involved, the entire test step has a duration of the time entered in
seconds. If a test step for a multiple measurement is involved, the
measurement duration for each measuring point is influenced.
If 0 seconds is selected, continuous measurement is conducted
which can only be ended by pressing a key.
1
For measuring sequence VDE 0701-0702-PRCD with the following set-
ting „PRCD type: PRCD (SPE)“ the measurement duration cannot be in-
fluenced.
The measurement duration which has been set in this case only affects
the RPE measurement with PRCD types „PRCD (standard)“ and
„PRCD-S (SPE)“.
Parameter
(as of FW 1.5.0)
Meaning
RPE measurement
duration
1
Set testing time for the protective conductor resistance
measurement (0 to 60 seconds)
IPE measurement
duration
Set testing time for the protective conductor current
measurement (0 to 60 seconds)
IG measurement
duration
Set testing time for the device leakage current measure-
ment (0 to 60 seconds)
Parameter
(as of FW1.8.0)
Meaning
IB measurement
duration
Set testing time for the touch current measurement
(0 to 60 seconds)
IB SK II measurement
duration
(only for IEC 60974) Set testing time for the touch current
measurement at PC II parts (with the exception of welding
outputs) (0 to 60 seconds)
RISO SK II measurement
duration
Set testing time for RISO measurements at PC II parts
(0 to 60 seconds)