User manual
66 GMC-I Messtechnik GmbH
16 Database
16.1 Creating Distributor Structures, General
A complete distributor structure with data for electrical circuits
and RCDs can be created in the PROFITEST MASTER test instru-
ment.
This structure makes it possible to assign measurements to the
electrical circuits of various distributors, buildings and customers.
There are two possible procedures:
• On location or at the
construction site:
Create the distributor
structure in the test
instrument.
A distributor struc-
ture with up to
50,000 structural
elements can be
created in the test
instrument, which is
saved to the instru-
ment’s flash mem-
ory.
or
• Create and save an image of an existing distributor structure
at a PC with the help of ETC report generating software (Electric
Testing Center) (see condensed operating instructions for ETC
report generating software). The distributor structure is then
transferred to the test instrument.
Note regarding ETC Report Generating Software
The following steps must be completed before using the soft-
ware:
• Install USB device drivers:
(required for operation of PROFITEST MASTER with a PC)
GMC-I Driver Control software can be downloaded from
Gossen Metrawatt's website at:
http://www.gossenmetrawatt.com
→ Products → Software → Software for Testers
→ Utilities → Driver Control
• Install ETC report generating software:
You can download the current ETC version free of charge from
our homepage under section mygmc after registration or login:
http://www.gossenmetrawatt.com
→ Products → Software → Software for Testers
→
Protocol Software without Database
→
ETC
→
myGMC
→
zum Login
16.2 Transferring Distributor Structures
The following data transfer operations are possible:
• Transfer a distributor structure from the PC to the test instru-
ment.
• Transfer a distributor structure including measured values
from the test instrument to the PC.
The test instrument and
the PC must be con-
nected with a USB cable
in order to transfer dis-
tributor structures and
data.
The following image
appears at the display
during transfer of struc-
tures and data.
16.3 Creating a Distributor Structure in the Test Instrument
Overview of the Meanings of Icons used to Create Structures
Icon Meaning
Main
Level
Sub-
Level
Memory menu, page 1 of 3
Cursor UP: scroll up
Cursor DOWN: scroll down
ENTER: acknowledge selection
+ → – change to sub-level
(open directory) or
– → + change to main level
(close directory)
Display of complete structure designation (max.
63 characters) or ID number (max. 25 characters)
in a zoom window
Temporarily switching back and forth between
structure designation and ID number.
These keys do not interfere with the main configu-
ration in the setup menu, see DB MODE on
page 11.
Hide structure designation or ID number
Change display to menu selection
Memory menu, page 2 of 3
Add a structural element
Meaning of icons from top to bottom:
Customer, building, distributor, RCD, electrical cir-
cuit, operating equipment, machine and earth
electrode (display of the icons depends on the
selected structural element).
Selection: UP/DOWN scroll keys and ↵
In order to add a designation to the selected
structural element, refer to edit menu in following
column.
EDIT
For additional icons see edit menu below
Delete the selected structural element.