Instructions / Assembly

STEP 15: BRIDGE RAILS TO PLAY SET
1: PLACE THE BRIDGE RAILS AGAINST THE GREEN CORNER POST AND CENTER CORNER POST
ON THE PLAY SET.
2: LEVEL EACH TOP BRIDGE RAIL AND ATTACH THEM TO THE CORNER POSTS WITH 5/16" X 3-
1/2" LAG SCREWS AND 5/16" WASHERS.
3: MAKE THE BOTTOM OF EACH LOWER BRIDGE RAIL 16" FROM THE TOP OF THE TOP BRIDGE
RAIL.
4: ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS WITH 5/16" X 3-1/2" LAG SCREWS
AND 5/16" WASHERS.
ATTACH TOP AND LOWER
BRIDGE RAILS TO CORNER
POSTS ON EACH SIDE WITH
5/16" X 3-1/2" LAG SCREWS
AND 3/8" WASHERS
16"
59"
TOP BRIDGE RAIL
LOWER BRIDGE RAIL
113