Instructions / Assembly
to the bottom of the Left Corner Posts, offset holes down with two 5/16” x 4-1/2” hex bolts
REAR OF PLAY SET
STEP 4: REAR SANDBOX/PANEL SUPPORT BOARD
and two 5/16” washers.
1: The 2 x 4 x 47-3/8” Panel Support (offset holes down) attaches to the side of the Right
Corner Posts with two 5/16” x 4-1/2” hex bolts and two 5/16” washers.
2: The 2 x 6 x 86” Right Sandbox Board (offset holes down) attaches to the side of the Right
Corner Posts with two 5/16” x 4-1/2” hex bolts and two 5/16” washers into the topmost holes
in the Right Sandbox Board.
3: The top holes of the 2 x 6 x 47-3/8” End Sandbox Board (with four pre-drilled holes) attach
CORNER POST #4
(FRONT - RIGHT)
(FRONT - LEFT)
CORNER POST #1
PANEL SUPPORT
HEX BOLT
(OFFSET HOLES DOWN)
RIGHT SANDBOX BOARD
5/16" WASHER
RIGHT SIDE OF PLAY SET
(REAR - LEFT)
CORNER POST #2
5/16" X 4-1/2"
(REAR - RIGHT)
CORNER POST #32 X 4 X 47-3/8"
(OFFSET HOLES DOWN)
5/16" WASHER
5/16" X 4-1/2"
HEX BOLT
5/16" WASHER
2 X 6 X 86"
HEX BOLT
5/16" X 4-1/2"
2 x 6 x 47-3/8"
END SANDBOX
BOARD
(OFFSET HOLES DOWN)
40










