™ playsets Rock Wall and Ladder positions are interchangeable. Nantucket Deluxe Model: 304 (301-1, 301-2, 304, 320, Extreme Tube Slide II Box, Slide Box with 308 piece inside) *51-0096-W* 51-0096-W Copyright © 2019 Gorilla Playsets All Rights Reserved 190 Etowah Industrial Court Canton, GA 30114 www.gorillaplaysets.
Please inspect and inventory all parts immediately upon accepting delivery. Use the inventory pages in the manual to make sure you have received all necessary parts. The quickest method to get any parts that are missing or damaged is to use our “Quick Response Center” located at: www.gorillaplaysets.com/support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY. THE RETAILER DOES NOT STOCK COMPONENTS. PLEASE RETAIN ALL INSTRUCTIONS FOR FUTURE REFERENCE.
GORILLA PLAYSETS WARRANTY – 2019 Gorilla Playsets® (“Gorilla”) warrants its play sets to be free from defects in workmanship and materials, under normal use and conditions, for 10 years for above ground structural wood components and for one year for all other components (e.g., swings, hardware, plastics, tarps, rope ladder, etc.).
IMPORTANT SAFETY GUIDELINES This product is recommended for use by children ages 3-11. This product is intended for residential use only and not intended for use in any public setting. A safety surface such as mulch or recycled tire should be used under the play set to prevent injury from falls. Also a 6 foot safety zone should be used around the entire play set. As with any home project, good judgment and respect for power tools will greatly reduce the risk of injury.
PRODUCT REGISTRATION - NANTUCKET DELUXE Gorilla Playsets ™ manufactures 3 EASY WAYS TO REGISTER the finest quality products that are designed for outstanding strength and durability. We back Complete the online registration form at: OPTION 1 http://www.gorillaplaysets.com/register our products with unparalleled warranties.
THIS PAGE INTENTIONALLY LEFT BLANK
IMPORTANT – PLEASE READ Congratulations! You have just purchase one of the finest residential wooden swing sets available today. As with any wooden product that spends its entire life outside, in varying elements, it is important to know what to expect with your new swing set so that your family can enjoy it for many years. As your swing set acclimates to its new environment, natural characteristics of the wood can show in the form of checks, or “cracks” in the lumber.
IMPORTANT DOCUMENTS CUSTOMER MUST READ AND RETAIN Please go to the following links and read important SAFETY information prior to using your new play structure. http://www.gorillaplaysets.com/Swing-Set-Safety-s/85.htm https://www.gorillaplaysets.com/Maintenance-s/129.htm http://www.gorillaplaysets.com/manuals.html (Click on your specific model) http://www.gorillaplaysets.com/Warranty-s/82.htm NOTE: Your children’s safety is our #1 concern.
Rock Wall and Ladder positions are interchangeable. Model: 304 (BOXES: 301-1, 301-2, 304, 320, Extreme Tube Slide II Box, Slide Box with 308 piece inside) REV: 1.24.
TABLE OF CONTENTS Safety Guidelines……………………………………….......……...........................Pages 3-6 Leveling Fort, General Information and Definitions............................................Pages 7-9 How to Install T-nuts, Board Identification, Predrill Lag screw Directions and Swing Beam Loading…………………………………...................................... Pages 10-14 Site Plan, Safety Zones, Required Tool List and Kit Contents....................... Pages 14-15 Hardware, Lumber and Accessory Checklists.............
Safety and Maintenance Tips for Your New Play Set: NOTE: Your children’s safety is our #1 concern. Observing the following statements and warnings reduces the likelihood of serious or fatal injury. Please review these safety rules regularly with your children.
Safety and Maintenance Tips for Your New Play Set: (continued) Playgrounds should be inspected on a regular basis. If any of the following conditions are noted, they should be removed, corrected, or repaired immediately to prevent injuries. • Hardware that is loose, worn or that has protrusions or projections. • Exposed equipment footings. • Scattered debris, litter, rocks, or tree roots. • Splinters, large cracks, and decayed wood components.
PLAYGROUND SURFACING MATERIALS SECTION 4 OF THE CONSUMER PRODUCT SAFETY COMMISSION’S OUTDOOR HOME PLAYGROUND SAFETY HANDBOOK9 Select Protective Surfacing One of the most important things you can do to reduce the likelihood of serious head injuries is to install shock-absorbing protective surfacing under and around your play equipment. The protective surfacing should be applied to a depth that is suitable for the equipment height in accordance with ASTM Specification F 1292.
Play Set Surfacing Recommendations: Below are some of the recommendations that the U.S. Consumer Product Safety Commission (CPSC) offers from its Handbook for Public Playground Safety. The guide can be downloaded in full at www.cpsc.gov/PageFiles/122149/325.pdf 1. Protective Surfacing - Since almost 60% of all injuries are caused by falls to the ground, protective surfacing under and around all playground equipment is the most critical safety factor on playgrounds.
2. Fall Zones - A fall zone, covered with a protective surfacing material, is essential under and around equipment where a child might fall. This area should be free of other equipment and obstacles onto which a child might fall. Stationary climbing equipment and slides should have a fall zone extending a Minimum of 6’ in all directions from the perimeter of the equipment. Swings should have a fall zone extending a minimum of 6’ from the outer edge of the support structure on each side.
General Info to Review Before Installation • Depending on your experience, assembly of the playset can take as little as 6 hours up to 24 hours, depending on size, after inventory of parts; therefore, we recommend you set aside a full two days for assembly. • Identify all of the parts for your play set. Empty each box and lay out boards so you can see each part. Your instruction book will have detailed drawings that will make it easy for you to recognize individual parts.
This page is a list of definitions and explanations used throughout our instructions to aid you in the assembly of your play set. Offset Holes- Throughout the installation procedures we will refer to parts with offset holes. This refers to the orientation of the holes on the board. An offset hole is one that is closer to one side than it is the other or in other words, it is not centered on the board.
Common Installation Practice Installing T-nuts When installing T-nuts into the wood, use a smooth faced hammer to set the face of the T-nut flush into the wood. Corner Post T-nut This picture shows the T-nut inserted and installed flush to the wood. Flush (Correct) Insert the barrel of the T-nut into the predrilled hole. Using a smooth faced hammer, drive the T-nut until the face of the T-nut is flush to the wood. This picture shows an end view of the T-nut installed flush to the wood.
HOW A T-NUT WORKS THE FIRST STEP IN OUR ASSEMBLY INSTRUCTIONS IS TO INSERT T-NUTS INTO THE CORNER POSTS. A T-NUT IS A FASTENER WHICH IS THREADED ON THE INSIDE AND IT FUNCTIONS JUST LIKE A STANDARD HEX NUT. YOU INSERT THE T-NUTS INTO THE PREDRILLED HOLES IN THE CORNER POSTS. THE T-NUT HAS A BARREL SHAPED END WHICH GOES INTO THE HOLE IN THE CORNER POST. THE T-NUT ALSO HAS AN FLANGE SHAPED END WITH TEETH.
BOARD IDENTIFICATION 1. On the end of each board there should be a small white tag that is stapled or stuck into place. Remove the staples and/or tag after the board is installed. 2. This white identifcation tag displays the thickness, width, length and an abbreviated description of the part. Example: a tag reads "2-4-3600-BPB" • The 2 is the thickness of the board. "Nominal Lumber" at a home center will measure 11/2" for the thickness. We "remill" that lumber to 1-3/8" thick.
PRE-DRILL LAG SCREW DIRECTIONS Pre-drilling holes for lag screws will make it easier to drive the screws in by hand. "Jobber" length drill bits are available in sizes that are longer than standard drill bits and those are ideal for the job. When using the drill bit you will have to "spot" drill the post and then remove the board you are attaching to finish drilling the hole. Pay attention to the DIAMETER of the lag screw you are installing. Your playset may come with two different diameter lag screws.
SWING BEAM LOADING Weight Limits for Accessories: The weight limit for a Swing Belt is 225 lbs. (Although 150lbs is the maximum recommended swinging weight capacity for the swing position.) The weight limit for a Trapeze Bar is 125 lbs. Maximum Allowable swinging weight for a three position swing: 1) The maximum allowable swinging weight at each Swing Belt position is 150 lbs. 2) The maximum allowable swinging weight at the Trapeze position is 125 lbs. 3) The MAXIMUM SWING BEAM LOAD IS 425 lbs.
Swing Beam Height: 7'-2-3/4" Height: 10'-4-1/2" 1st Level 47-3/8" sq. x 48-1/4"H Please familiarize with the manual, parts/components and general 2nd Level 19-3/8" x 47-3/8"yourself x 58-1/4"H construction process of your new playset before getting started.
SAFETY ZONES 1 30'-3 2 " 6'-0" 6'-0" 5 13'-9 8 " 13 27'-11 16 " 6'-0" 6'-0" 6'-0" 6'-0" 5 13'-9 8 " 6'-0" 6'-0" 16
REQUIRED TOOL LIST: ___ Standard or Cordless Drill w/ Phillips Bit (#2 square bit provided) ___ Drill Bits 3/32”, 1/8”, 3/8”, 7/64”, 9/64”, 11/64” and a 1” Paddle style bit.
11-0020 301/301D Hardware PAGE 1 OF 2 REV: B 9/16/2015 JH #14 X 1-1/4" PAN HEAD SCREW QTY: 6 9 #8 X 1-1/4" WOOD SCREW QTY: 8 #8 X 1-1/2" WOOD SCREW QTY: 106 8 #8 X 2" WOOD SCREW QTY: 191 7 #8 X 2-1/2" WOOD SCREW QTY: 34 #8 X 3" WOOD SCREW QTY: 14 6 5 5/16" TEE NUT QTY: 42 4 3/8" LOCK NUT QTY: 19 3 TORQUE WASHER QTY: 17 3/8" WASHER QTY: 31 2 1 5/16 X 4-1/2" HEX BOLT QTY: 32 5/16" x 2-1/2" HEX BOLT QTY: 2 5/16 X 1-1/2" HEX BOLT QTY: 8 5/16" WASHER QTY: 68 USE THE RULER TO THE RIGHT TO MEASUR
11-0020 301/301D Hardware PAGE 2 OF 2 REV: B 9/16/2015 JH 5/16" X 3-1/2" HEX LAG SCREW QTY: 26 3/8 X 3-1/2" HEX LAG SCREW QTY: 12 9 8 7 6 5 4 #2 SQUARE DRILL BIT QTY: 1 3 2 PLASTIC BOLT CAP QTY: 19 1 3/8 x 9" CARRIAGE BOLT QTY: 1 3/8 x 7" CARRIAGE BOLT QTY: 12 3/8 x 6-1/2" CARRIAGE BOLT QTY: 4 3/8 x 3-1/2" CARRIAGE BOLT QTY: 2 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS. PICTURE VIEWS SHOWN ABOVE ARE 1:1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES.
11-0092 304 Hardware PAGE 1 OF 1 REV: B 1/17/2019 JH 9 #8 X 1-1/4" WOOD SCREW QTY: 4 #8 X 1-1/2" WOOD SCREW QTY: 72 8 #8 X 2" WOOD SCREW QTY: 72 3/8" X 1-1/8" BLACK PLASTIC PLUG QTY: 8 7 #8 X 2-1/2" WOOD SCREW QTY: 6 #8 X 3" WOOD SCREW QTY: 6 6 5 4 3 #2 SQUARE DRILL BIT QTY: 1 2 1 5/16 X 4-1/2" HEX BOLT QTY: 22 5/16" X 3-1/2" HEX LAG SCREW QTY: 18 5/16" TEE NUT QTY: 22 5/16" WASHER QTY: 40 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS.
PICTURE DESCRIPTION QTY. 1 X 5 X 52" ROOF FINISHER (TONGUE ONLY) 1-5-5200-RF 2 1 X 5 X 52" ROOF STARTER (GROOVE ONLY) 1-5-5200-RS 2 1 X 5 X 52" ROOF BOARD (TONGUE AND GROOVE) 1-5-5200-RB 14 3-1/2 X 3-1/2 X 52" ROOF PEAK 1-6-5200-RP 1 NOTE: 2 PIECES ARE EXTRA AND WILL BE LEFTOVER. 2 X 4 X 12" BOTTOM PANEL BOARD - LEFT 2-4-1200-BPBL 3 NOTE: 2 PIECES ARE EXTRA AND WILL BE LEFTOVER.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION 4 X 6 X 108" SWING BEAM 4-6-10800-SB 1 5/4 X 2 X 13" SMALL RAY 125-2-1300-SR 12 5/4 X 2 X 17" LARGE RAY 125-2-1700-LR 2 5/4 X 2-1/4 X 111/2" HORIZONTAL WINDOW SUPPORT 125-225-1150HWS NOTE: 4 PIECES ARE EXTRA AND WILL BE LEFTOVER. QTY.
PICTURE DESCRIPTION QTY.
304 PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY. SWING PLATE 11-5002 1 CLIMBING ROCKS (07-0008 IS A PACK OF 5) A-FRAME SWING LEG BRACKET 11-5010 HARDWARE BOXES: 301 & 304 301 11-0020 304 11-0092 10 ROCKS 1 1ea.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION 10' ROPE (GREEN) DORMERS AND CHIMNEY (UNASSEMBLED) 320 BOX FLAG KIT 09-1014 GROUND STAKE (PAIR) 07-0016-P QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
STEP 1: CORNER POST LAYOUT 1: This step is critical to building the fort properly. If any mistakes are made here, you will need to dis-assemble and then re-assemble to make your corrections. 2: Lay out each of the 4 x 4 x 96” Corner Posts in the area you intend on building the fort side of the playset. 3: Use the diagram below to correctly identify and orient the necessary direction the posts should face.
STEP 2: INSERTING T-NUTS INTO CORNER POSTS 1: Use a hammer to seat the t-nuts after inserting them into the holes shown in the diagram below. 2: The barrel of the t-nut should go in the hole first. Hammer the t-nut until it is flush/almost flush to the corner posts. No t-nuts will be installed in the Right or Left Corner Posts where shown below.
STEP 3: SANDBOX BOARDS AND PANEL SUPPORTS 1: The 2 x 4 x 47-3/8” Panel Supports (offset holes up) attach to the front and rear corner posts with two 5/16” x 4-1/2” hex bolts and two 5/16” washers. 2: Attach the top holes in the 2 x 6 x 47-3/8” End Sandbox Boards (offset holes up) to the front and rear corner posts with two 5/16” x 4-1/2” hex bolts and two 5/16” washers.
STEP 4: REAR SANDBOX/PANEL SUPPORT BOARD 1: The 2 x 4 x 47-3/8” Panel Support (offset holes down) attaches to the side of the Right Corner Posts with two 5/16” x 4-1/2” hex bolts and two 5/16” washers. 2: The 2 x 6 x 86” Right Sandbox Board (offset holes down) attaches to the side of the Right Corner Posts with two 5/16” x 4-1/2” hex bolts and two 5/16” washers into the topmost holes in the Right Sandbox Board.
STEP 5: DECK SUPPORTS 1: Attach one Deck Support (offset holes down) to the inside of the Left and Right Corner Posts with two 5/16” x 4-1/2” hex bolts and 5/16” washers. Note: One Panel Support Board was removed for clarity. 2 X 4 X 47-3/8" DECK SUPPORT (OFFSET HOLES DOWN) 5/16" WASHER 5/16" X 4-1/2" HEX BOLT NOTE: PANEL SUPPORT BOARD REMOVED FOR CLARITY.
STEP 6: LEVELING THE PLAY SET AND INSTALLING LAG SCREWS 1: Level your play set frame. Level side to side and front to back. Check the diagonals for square. Once you have a level and square play set frame you may install lag screws. 2: Install one 5/16” x 3-1/2” Lag Screw with 5/16” washer into the empty holes in all of the 2 x 6 parts at the base of the play set frame.
STEP 7: FORT SUPPORTS 1: Place a 5/16” Tee Nut into the hole in the Fort Supports as shown. 2: From the inside of the Right Panel Board loosely attach each Fort Support with one 5/16” x 2-1/2” Hex Bolt and one 5/16” washer. 3: Measure 2” and 3-1/2” down from the tip of each Fort Support and drill a 1/8” hole through the Fort Support along the center. (See Detail A) 4: Place each Fort Support against the Corner Post. The side of the Fort Support should be flush with the right side of the Right Corner posts.
STEP 8: DECK SPACERS 1: Place a 5/4 x 4 x 40-1/2” Deck Spacer between the Left and Right Corner Posts on top of the Deck Supports as shown below. 2: The Deck Spacer side should be flush with the inside of the Panel Support. 3: Attach each Deck Spacer to the Deck Supports with two 2” Wood Screws.
STEP 9: PANEL SUPPORT BOARD 1: Place the 2 x 4 x 47-3/8” Panel Support against the front side of the play set with offset holes up. Attach the Panel Support with two 5/16” x 4-1/2” hex bolts and 5/16” washers. 2: Center the 2 x 4 x 27-1/2" Center Post side to side. Fasten the Center Post to the Panel Support with two #8 x 2-1/2" wood screws. Then go from the bottom of the Deck Spacer up into the bottom of the Center Post with two #8 x 2" wood screws.
STEP 9A: DECK STRINGER 1: Center the 2 x 4 x 47-3/8" Deck Stringer underneath the Deck Spacers. 2: Attach the Deck Stringer to the Deck Spacers with two #8 x 2" wood screws.
STEP 10: FACE BOARDS 1: Locate two 2 x 4 x 47-3/8” Face Boards. 2: Attach a Face Board to the front of the Left Corner posts making sure the top side is flush with the top side of the Panel Supports. 3: Attach the Face Board with six 2-1/2” wood screws. 4: Repeat this process attaching the other Face Board to the right side of the Right Corner posts.
STEP 11: LADDER ASSEMBLY 1: Lay one 2 x 4 x 57” Ladder Side on a flat surface with channels facing down. Place the barrel of a T-Nut in the hole at the top of the Ladder Side, and secure with a hammer. Repeat this step for the other Ladder Side. 2: Flip the Ladder Side over so that the channels are facing up. 3: Place the Ladder Steps into the channels, and then place the second Ladder Side on top, with the channels facing down. 4: Now place two 2” wood screws in each step.
DECISION FOR LADDER AND ROCK WALL At this point in the instructions you must decide how your playset will be built. If you wish you may place the ladder on the front or the rear of the playset. Likewise you may place the rock wall on the front or the rear of the playset. For several future steps you will be told to skip to the next step or to leave off parts. As you proceed please pay attention to which side of the set you intend to place the ladder or rock wall.
STEP 12: ATTACHING THE LADDER ON FRONT NOTE: IF YOU ARE INSTALLING THE LADDER ON THE REAR OF THE PLAYSET PROCEED TO STEP 12A NOW. 1: The Ladder attaches to the front of the play set, 24-3/8" from the outside edge of the FrontRight corner post. 2: Make sure the ladder is level. The bottom edge of the 90 brackets should be 3/4” up from the bottom edge of the 2 x 4. Mark the position of the bracket holes on the 2 x 4. 3: Drill 3/8” holes where marked. 4: Insert 5/16” T-nuts in the back of the holes.
STEP 12A: ATTACHING THE LADDER ON REAR 1: The Ladder attaches to the rear of the play set, 14-7/16" from the outside edge of the Left-Rear corner post. 2: Make sure the ladder is level. The bottom edge of the 90 brackets should be 3/4” up from the bottom edge of the 2 x 4. Mark the position of the bracket holes on the 2 x 4. 3: Drill 3/8” holes where marked. 4: Insert 5/16” T-nuts in the back of the holes. 5: Attach the 90 brackets to the 2 x 4 with two 5/16” x 1-1/2” hex bolts and two 5/16” washers.
STEP 13: ROCK WALL 1: Locate two 2 x 4 x 57 Rock Wall Side boards. Lay the boards out as shown and insert a 5/16” t-nut into the hole on the inside of each board. Use a hammer to set each t-nut flush with the board. **IF THE ROCK WALL IS BEING INSTALLED ON THE REAR THEN INSTALL THE T-NUTS AS SHOWN. IF THE ROCK WALL IS BEING INSTALLED ON THE FRONT THEN LEAVE OFF THE TNUTS.
STEP 14: ROCK WALL 1. Locate ten 5/4 x 5 x 23-7/8” Rock Wall Boards and one 5/4 x 5 x 23-7/8” Bottom Rock Wall Board with one big hole in it. 2. Place one Rock Wall Board at the top of the Rock Wall Sides nearest the holes where you previously installed the tee nuts. Make sure the Rock Wall Board is flush with the ends and sides of the Rock Wall Side boards. 3. Attach the Rock Wall Board with four 2” wood screws. 4.
STEP 15: ROCK WALL 1: Locate two 90 Green Brackets, two 5/16” washers and two 5/16” x 1-1/2” hex bolts. 2: Fasten the tapered side of each 90 Green Bracket to each Rock Wall Side with a 5/16” x 1-1/2” hex bolt and 5/16” washer. ** IF THE ROCK WALL IS BEING INSTALLED ON THE REAR THEN FASTEN THE BRACKETS AS SHOWN. IF THE ROCK WALL IS BEING INSTALLED ON THE FRONT THEN LEAVE OFF THE BRACKETS.
STEP 16: ROCK WALL 1: Locate two bags of Climbing Rocks. Inside each bag should be five rocks, fifteen #14 x 11/4” pan head screws and fifteen 1/4” flat washers. 2: Place the Climbing Rocks in a staggered pattern on the Rock Wall Boards. Place one rock on each board except for the bottom rock wall board with the hole in it. 3: Attach each Climbing Rock with three #14 x 1-1/4” pan head screws and three 1/4” flat washers.
STEP 17: ROCK WALL 1: Place the 5/4 x 3 x 23-7/8” Rock Wall Top Cap on top of the Rock Wall Sides flush with the top Rock Wall Board. 2: Fasten the 5/4 x 3 x 23-7/8” Rock Wall Top Cap to the Rock Wall Sides and the top Rock Wall Board with four 2” wood screws. **IF THE ROCK WALL IS BEING INSTALLED ON THE REAR THEN FASTEN THE TOP CAP AS SHOWN. IF THE ROCK WALL IS BEING INSTALLED ON THE FRONT THEN LEAVE THE TOP CAP OFF.
STEP 18: ATTACHING ROCK WALL ON REAR NOTE: IF YOU ARE ATTACHING THE ROCK WALL ON THE FRONT OF THE PLAYSET PROCEED TO STEP 18A NOW. 1: The Rock Wall attaches to the rear of the play set, 11-3/4” from the outside edge of the rear corner post. 2: Make sure the Rock Wall is level. The bottom edge of the 90 brackets should be 3/4” up from the bottom edge of the 2 x 4. Mark the position of the bracket holes on the 2 x 4. Drill 3/8” holes where marked. 3: Insert 5/16” t-nuts in the back of the holes.
STEP 18A: ATTACHING ROCK WALL ON FRONT 1: Place the 4 x 4 x 21-1/16" Rock Wall Mount 2" away from the side of the left front corner post. The top of the mount should be flush to the top of the deck. 2: Fasten the Rock Wall Mount to the panel support with six #8 x 3" wood screws. 3: Place the Rock Wall over the Rock Wall Mount. Center the hole in the Rock Wall Side vertically on the mount. Predrill 3/16" holes 2" deep into the Rock Wall Mount using the holes in the Rock Wall sides as a guide.
STEP 19: DECK BOARDS 1: Seven 5/4 x 6 x 47 3/8” Deck Boards will lay across the Deck Supports, flush to the Face Boards. There will be approximately a 1/4” gap between each Deck Board. 2: Space the Deck Boards evenly across the supports. 3: Secure each Deck Board to the Deck Supports and the Deck Stringer with five 2” wood screws, two per end and one in the center. 5/4 X 6 X 47-3/8" DECK BOARD 2" WOOD SCREWS (5 PER BOARD) Note: Some boards removed from this view for clarity.
STEP 20: ANGLE SUPPORTS 1: Four 2 x 4 x 13” Angle Supports are mounted underneath the deck on the left and right of the fort. (These are called out by the letter “X”) 2: Attach each Angle Support (X) to the Deck Support with two 2-1/2” wood screws at the top going through the Deck Support first and then into the Angle Support (X). Attach the bottom of the Angle Support (X) to the corner post with one 2” wood screw and one 3” wood screw.
STEP 21: PANEL AND PANEL SUPPORT BOARDS **NOTE: IF YOU ARE BUILDING THE PLAYSET WITH THE ROCK WALL ON THE FRONT THEN PROCEED TO STEP 21A.** 1: Place the 2 x 4 x 12” Bottom Panel Board - Left and 2 x 4 x 12” Bottom Panel Board - Right on top of the 2 x 4 as shown below with offset holes up. Attach each Bottom Panel Board with one 5/16” x 3-1/2” lag screw and 5/16” washer. 2: Place the 2 x 4 x 47-3/8” Rock Wall Side Top Panel Board against the rear of the play set with offset holes up.
STEP 21A: ARCHED TOP AND PANEL SUPPORT BOARDS 1: Place one Arched Side Top Board on the rear of the set where shown. Attach the Arched Side Top Board through the top holes with 5/16" x 4-1/2" hex bolts with washers. Then attach the bottom holes with 5/16" x 3-1/2" lag screws with washers. 2: Place the 2 x 4 x 12" Bottom Panel Board - Left and 2 x 4 x 12" Bottom Panel Board Right on top of the 2 x 4 as shown below with offset holes up.
STEP 22: PANEL SUPPORT 1: Place the 2 x 4 x 47-3/8” Panel Support on top of the 2 x 4 at the right side of the play set with offset holes down. Attach the Panel Support with two 5/16” x 3-1/2” lag screws and two 5/16” washers.
STEP 23: PANEL SLATS 1: Locate eleven 5/4 x 3 x 28” Panel Slats. Four Panel Slats will be installed at rear of the play set. Seven Panel Slats will be installed at the right of the play set. 2: At the right of the play set center one Panel Slat over the center of each deck board. Square each Panel Slat to the Panel Support. Attach each Panel Slat to the inside of the Panel Supports with two 2” wood screws for each Panel Slat.
STEP 24: SWING BEAM SUPPORT 1. The 4 x 4 x 47-3/8” Swing Beam Support has counter-sunk holes in the center and on the ends. Install the Swing Beam Support so that the counter-sunk holes on each end of the beam face out, and the counter-sunk holes in the center face down. 2. Fasten the Swing Beam Support to the right corner posts using 3/8” x 6-1/2” carriage bolts and torque washers. Place the carriage bolt into the torque washer, then into the hole of the corner post and set with a hammer.
STEP 25: SWING BEAM PLATE 1: Place the Swing Beam Plate on top of the Swing Beam Support, lining up the pilot holes. 2: Fasten the Swing Beam Plate to the Swing Beam Support on the outside holes using 3/8” x 3-1/2” carriage bolts from the top and 3/8” washers with 3/8” lock nuts on the bottom. Place bolt caps over exposed threads after securing. 3: Leave the middle hole empty, it will be used later.
STEP 26: ATTACH SWING LEGS TO BRACKET 1: Place the 4 x 4 x 96” Swing Legs flush to the top of the Swing Leg Bracket. 2: Predrill 11/64" pilot holes into the Swing Legs through the holes in the Swing Leg Bracket. 3: Fasten the Swing Legs to the Swing Leg Bracket with eight 3/8” x 3-1/2” lag screws and eight 3/8” washers.
STEP 27: IRON DUCTILE SWING HANGERS 1: Line up the holes of the Iron Ductile Swing Hangers with the holes in the Swing Beam. 2: Fasten the Iron Ductile Swing Hangers to the Swing Beam using 3/8” x 7” carriage bolts with torque washers on top of the Swing Beam, and 3/8” lock nuts with 3/8” washers on the bottom. Place bolt caps over exposed threads after securing.
STEP 28: REST SWING BEAM ON FORT *Two people are required for this step. 1. Sit the swing beam legs upright. 2. Line up the pre-drilled holes and rest the swing beam on top of the fort and swing legs. Make sure the iron ductiles are facing down.
STEP 29: SWING BEAM TO SWING LEGS 1: Fasten the Swing Beam to the Swing Leg Bracket using 3/8” x 6-1/2” carriage bolts with torque washers on top of the Swing Beam, and 3/8” lock nuts with 3/8” washers underneath. 2: Predrill an 11/64" hole through the middle hole in the swing leg bracket. Use a 3/8 x 3-1/2” lag screw and 3/8” washer in the middle hole of the Swing Leg Bracket. 3: Place bolt caps over exposed threads after securing.
STEP 30: SWING BEAM TO FORT *An extra person is required for this step. 1: Have one person line up the hole in the end of the Swing Beam with the middle hole on the Swing Beam plate. The other person may have to carry the other end where the legs are located to accomplish this task. 2: Fasten the Swing Beam to the Swing Beam Plate and Swing Beam Support using a 9” carriage bolt with a torque washer on top and a 3/8” lock nut and washer on the bottom.
STEP 31: LEVEL THE SWING BEAM 1: Place a level on top of the Swing Beam and adjust the legs in or out as needed to make the Swing Beam level.
STEP 32: SWING LEG CROSS-MEMBER 1: Position the 2 x 4 x 58” Swing Leg Cross-Member against the Swing Legs. 2: Level the Swing Leg Cross-Member and mark through the holes onto the swing legs. 3: Drill 11/64" holes by 2" deep at each mark. 4: Secure the Cross-Member to the Swing Legs with 3/8” x 3-1/2” lag screws and 3/8” washers.
STEP 33: ARCHED TOP BOARDS 1: Place one Arched Side Top Board on the rear side of the play set at the top. Attach the Arched Side Top Board through the top hole into the t-nut in the corner post with 5/16” x 4-1/2” hex bolts and 5/16” washers. 2: Attach the Arched Side Top Board through the bottom hole into the corner posts with 5/16” x 3-1/2” lag screws and 5/16” washers. 3: Place the Window Top Panel Board on the front side of the play set at the top.
STEP 34: DECK SUPPORTS 1: Measure 9" up from the deck onto the left rear corner post. Make the top of the Deck Support flush to the mark. 2: Make the end of the Deck Support flush to the inside of the corner post. 3: Mark through the hole onto the corner post. Predrill a 9/64" hole by 2" deep into the post. Place the Deck Support back into place with the holes offset down. Secure the Deck Support to the corner post with a 5/16" x 3-1/2" lag screw and a 5/16" washer.
STEP 35: CORNER POSTS 1: Hammer a T-Nut into the hole at 55" in the 4 x 4 x 90" Corner Post. 2: Fasten the Deck Support to the Corner Post with a 5/16" x 4-1/2" hex bolt and a 5/16" washer. 3: Hammer a T-nut into the hole at 55" in the second 4 x 4 x 90" Corner Post. 4: Fasten the second Deck Support to the second Corner Post with a 5/16" x 4-1/2" hex bolt and a 5/16" washer.
STEP 36: PANEL SUPPORTS 1: Hammer three 5/16" T-nuts into the holes on the inside of each of the 4 x 4 x 90" Corner Posts. 2: Place a 2 x 4 x 19-3/8" Panel Support (OFFSET UP) at the top, middle and lower positions on the outside of the corner posts. 3: Fasten each Panel Support to the 90" Corner Posts with a 5/16" x 4-1/2" hex bolt and a 5/16" washers. 4: Make sure the main deck is level. Level the Deck Supports. Shim the 90" Corner Posts up or down until both Deck Supports are level.
STEP 37: SIDE TOP WINDOW BOARD AND SANDBOX BOARD NOTE: IF YOU ARE BUILDING THE PLAYSET WITH THE LADDER ON THE REAR OF THE SET THEN GO TO STEP 37A NOW. 1: Hammer four T-nuts into the inside of the 90" corner posts to attach the boards shown. 2: Fasten the 2 x 6 x 47-3/8" Arched Side Top Panel Board to the middle of the 90" posts with 5/16" x 4-1/2" hex bolts and 5/16" washers.
STEP 37A: ROCK WALL SIDE TOP PANEL BOARD AND SANDBOX BOARD. 1: Hammer four T-nuts into the inside of the 90" corner posts to attach the boards shown. 2: Fasten the 2 x 4 x 47-3/8" Rock Wall Side Top Panel Board (OFFSET UP) to the middle of the 90" posts with 5/16" x 4-1/2" hex bolts and 5/16" washers. 3: Fasten the 2 x 6 x 47-3/8" Sandbox Board (OFFSET DOWN) to the bottom of the 90" posts with 5/16" x 4-1/2" hex bolts and 5/16" washers.
STEP 38: DECK SPACERS AND DECK BOARDS 1: Place the 5/4 x 4 x 40-1/2" Deck Spacers between the 96" posts and the 90" posts. 2: Place the 5/4 x 6 x 47-3/8" Deck Boards between the Deck Spacers. 3: Space the Deck Spacers and Deck Boards about 3/8" apart. You may use a 3/8" bolt between boards to space them out. Note: The Deck Spacer between the 96" posts will be inset roughly 1/4" from the inside of posts going out.
STEP 39: EXTREME TOP PANEL BOARD 1: Install a T-nut in the top hole on the inside of each of the 90" corner posts. 2: Install a T-nut in the 2ND hole from the top on the outside of each of the 90" corner posts. 3: Fasten the 2 x 4 x 47-3/8" Extreme Top Panel Board (OFFSET DOWN) to the posts with 5/16" x 4-1/2" hex bolts and 5/16" washers.
STEP 40: EXTREME SLIDE POSTS 1: Hammer a T-nut into the hole at the top of each 4 x 4 x 32" Extreme Slide Post. 2: Place each post on top of the deck spacer and fasten them to the top panel board with a 5/16" x 4-1/2" hex bolt and 5/16" washer. 3: Make each post square to the deck spacer. Make the outside of each post flush to the outside of each 90" post. 4: Secure the bottom of each post to the deck spacer with two #8 x 3" wood screws.
STEP 41: EXTREME BLOCK 1: Place the 4 x 4 x 37-3/4" Extreme Block under the deck spacer. The outside face of the block should be flush to the outside of the extreme posts. 2: Fasten the Block to the deck spacer through the center hole with a #8 x 2" wood screw. Now go back and add 4 more #8 x 2" screws through the deck spacer into the Extreme Block.
STEP 42: CENTER DECK SUPPORT 1: Place the 2 x 4 x 16" Center Deck Support under the deck as shown. Center it side to side. 2: Fasten the Center Deck Support to the deck boards and deck spacer with #8 x 2" wood screws.
STEP 43: PANEL SLATS 1: Place two 5/4 x 3 x 28" Panel Slats against the top and bottom boards on the inside as shown. 2: Use the measurements shown to locate the slats. Then secure each slat at the top and bottom with a #8 x 2" wood screw. 3: Repeat substeps 1 and 2 for the slats on the other side.
STEP 44: STEP 1: Place the 2 x 4 x 47-3/8" Deck/Panel Support Board (OFFSET UP) against the 96" corner posts on the inside. Space the board so the bottom is 3-1/4" off the deck. 2; Fasten the Deck/Panel Support Board to the corner posts with 5/16" x 3-1/2" lag screws with 5/16" washers.
STEP 45: ROOF SUPPORTS 1: Drill a 1/8" pilot hole about 1-1/2" from the end of one of the Roof Supports. 2: Place the Roof Supports together and line them up at the tip. Then install a #8 x 21/2" wood screw to connect the boards.
STEP 46: ROOF SUPPORTS 1: Place the Roof Support assembly on the 96" posts as shown below. Push DOWN on each Roof Support before you tighten the bolt. 2: Fasten each Roof Support to the corner post with a 5/16" x 4-1/2" Hex Bolt and a 5/16" washer.
STEP 47: ROOF SUPPORT ASSEMBLY 1: Place the Roof Supports together as shown. Fasten the Roof Peak Support to the Roof Supports with #8 x 2" wood screws. 2: Next you will use a Roof Starter on each side of the Roof Support Assembly as a spacer. You will temporarily fasten the starters here to place the Roof Support Assembly onto the posts correctly in the next step. 3: Fasten each Roof Starter to the Roof Support with #8 x 1-1/2" wood screws.
STEP 48: ROOF SUPPORTS 1: Place the Roof Support Assembly directly underneath the previous installed Roof Support Assembly. 2: The boards used as spacers should be flush to the bottom of the UPPER Roof Supports. 3: Fasten the Roof Support Assembly to the corner posts with 5/16" x 3-1/2" lag screws and 5/16" washers. Roof Support (UPPER) Each spacer board should be flush to the bottom of the Roof Support above it prior to installing lag screws.
STEP 49: REMOVAL OF PARTS These parts must be removed to install the Roof on the upper platform. 1: Remove the upper Roof Support Assembly and set aside for later. 2: Remove the Roof Starters from the lower Roof Support Assembly.
STEP 50: ROOF SUPPORT ASSEMBLY 1: Place the Roof Supports together as shown below. 2: Fasten the Roof Peak Support to the Roof Supports with #8 x 2" Wood Screws.
STEP 51: ROOF SUPPORT ASSEMBLY INSTALLATION 1: Place the Roof Support Assembly on the outside of the 90" corner posts with the triangle facing out. 2: Fasten the Roof Support Assembly to the corner posts with 5/16" x 4-1/2" hex bolts and 5/16" washers.
STEP 52: ROOF STARTERS 1: Place the 1 x 5 x 18-3/8" Roof Starters at the peak of the roof as shown. The edges should touch one another but the parts should not overlap. 2: Before installing the starters check the dimensions shown below to make the roof supports parallel. 3: Once the roof supports are parallel the Roof Starters may be installed using #8 x 11/2" wood screws. Measure between the roof supports at the bottom. Here the measurement shown is 14-5/8" (Your dimension may vary.).
STEP 53: ROOF PEAK 1: Place the 1 x 6 x 17" Roof Peak on top of the Roof Starters. Line up the end of the Roof Peak with the end of the Starters as shown so that they are flush to one another. 2: Fasten the Roof Peak to the Roof Starters with #8 x 1-1/4" wood screws.
STEP 54: ROOF BOARDS 1: Place a 1 x 5 x 18-3/8" Roof Board on top of the roof supports. Place the tongue of the roof board into the groove of the roof starter. Make the ends of the boards flush. 2: Fasten the Roof Board to the roof supports with #8 x 1-1/2" wood screws. 3: Repeat substeps 1-2 and install the remaining 6 Roof Boards. 4: Repeat substeps 1-3 to install 7 Roof Boards on the other side of the roof.
STEP 55: ROOF FINISHERS 1: Place the tongue of a 1 x 5 x 18-3/8" Roof Finisher into the groove of the Roof Board above it. Make the ends of the boards flush. 2: Fasten the Roof Finisher to the roof supports with #8 x 1-1/2" wood screws. 3: Repeat substeps 1-2 to install the second Roof Finisher on the other side of the roof.
STEP 56: ROOF SUPPORTS 1: Replace the Roof Support assembly that was removed in Step 49. Fasten it to the corner posts with 5/16" x 4-1/2" hex bolts and 5/16" washers. 2: Take the second Roof Support Assembly that was made in Step 50 and install it over the Swing Beam Mount. Fasten the Roof Support to the corner posts with 5/16" x 4-1/2" hex bolts and 5/16" washers.
STEP 57: ROOF STARTERS 1: Place the 1 x 5 x 52" (groove only) Roof Starter boards at the peak of the roof. Measure at the bottom of the roof supports. In this case for example the measurement is 47-3/8". After you install the Roof Starters the dimension at the top should be 47-3/8" also. (The dimension between the Roof Supports for your set could vary from the 47-3/8" mentioned below.) 2: The Roof Starters should be placed as close together as possible near the peak without the boards overlapping.
STEP 58: ROOF PEAK 1: Place the 3-1/2 x 3-1/2 x 52" Roof Peak on top of the Roof Starter Boards and fasten with four #8 x 1-1/2" wood screws.
STEP 59: ROOF BOARDS/ROOF FINISHERS AND CHIMNEY AND DORMERS 1: Place the 1 x 5 x 52” Roof Boards on top of the Roof Supports, fitting the tongue into the groove of the Roof Starter. The holes in the Roof Boards should be centered over the Roof Supports. There are seven Roof Boards on each side of the roof. If necessary place a scrap 2 x 4 board against the Roof Board and hammer on it to seat the tongue into groove for the Roof Boards.
STEP 60: SUN SUPPORT AND SUN 1: Place a 2 x 6 x 16" Sun centered on top of the 2 x 4 x 43-3/4" Sun Support. The face of the Sun should be flush with the face of the Sun Support. Fasten the Sun to the Sun Support with two #8 x 3 wood screws. 2: Place the assembly into position underneath the Roof Supports. Make sure the Sun Support is level. Attach the Sun Support through the pre-drilled holes in the bottom to the Roof Supports with two #8 x 2-1/2" wood screws.
STEP 61: SUN RAYS 1: All the sun ray pieces get installed to the inside surface of the Roof Supports and the Sun piece. 2: Place the 5/4 x 2 x 17” Large Ray centered under the peak of the Roof Supports. Attach the Large Ray to the Roof Support and Sun with two #8 x 1-1/2” wood screws. 3: Arrange six 5/4 x 2 x 13” Small Rays on either side of the Large ray (three small rays per side) as shown below. Attach each Small Ray to the Roof Support and Sun with two #8 x 1-1/2” wood screws.
STEP 62: SUN SUPPORT, SUN AND EXTREME PANEL SLATS 1: Place the 2 x 6 x 16" Sun on top of the 2 x 4 x 43-3/4" Sun Support. The face of the Sun should be flush with the face of the Sun Support. Fasten the Sun to the Sun Support with two #8 x 3" wood screws. 2: Place the 5/4 x 3 x 32" Extreme Panel Slats into position as shown below. Fasten each Extreme Panel Slat to the Sun Support with a #8 x 2" wood screw.
STEP 63: SUN SUPPORT ASSEMBLY 1: Place the Sun Support assembly from the prior step under the roof supports as shown. The panel slats will be on the inside. 2: Level the Sun Support and then fasten it to the Sun Support with #8 x 2-1/2" wood screws. Place the Sun Support assembly from the previous step here.
STEP 64: SUN RAYS 1: All the sun ray pieces get installed to the inside surface of the Roof Supports and the Sun piece. 2: Place the 5/4 x 2 x 17” Large Ray centered under the peak of the Roof Supports. Attach the Large Ray to the Roof Support and Sun with two #8 x 1-1/2” wood screws. 3: Arrange six 5/4 x 2 x 13” Small Rays on either side of the Large ray (three small rays per side) as shown below. Attach each Small Ray to the Roof Support and Sun with two #8 x 1-1/2” wood screws.
STEP 65: WINDOWS 1: Center the 5/4 x 6 x 20" Vertical Window Support 5/16" above the center post beside the ladder or rock wall at the front of the playset. Fasten it at the top and bottom with #8 x 2" wood screws. 2: Place a window on top of the 2 x 4 at the front of the set. The 1" wide portion of the window frame MUST be at the top. The window frame will overlap the vertical window support and will sit on top of the 2 x 4.
STEP 66: WINDOWS 1: Place the Windows in the openings as shown. The 1" tall portion of the window frame should be at the top as described previously. Fasten the Window on the sides with #8 x 1-1/2" wood screws.
STEP 67: SAFETY BOARD 1: Place the 2 x 4 x 47-3/8" Panel and Deck Support (Safety Board) offset down 24" above the bottom of the long sandbox board. This board is meant to be a visual aid to keep children from running through the base of the playset into the swing zone. 2: Fasten the Panel and Deck Support (Safety Board) to the corner posts with 5/16" x 31/2" lag screws and 5/16" washers.
STEP 68: WAVE SLIDE 1: Place the Wave Slide centered in the opening at the front of the playset. 2: Place the rear edge of the slide about 4-1/2" in from the board on the front of the playset. 3: Fasten the slide to the deck using #14 X 1-1/4" pan head screws. HINT: You may use a 1/8" drill bit to predrill holes through the dimples in the slide into the deck board if you wish. **ONCE THE SLIDE IS FASTENED DO NOT PICK THE SLIDE UP FROM THE END.** REAR EDGE is inset about 4-1/2" from this board.
STEP 69: ROCK WALL ROPE NOTE: IF YOU ARE INSTALLING THE ROCK WALL ON THE FRONT OF THE PLAYSET THEN PROCEED TO STEP 69A. 1: Thread the Rope as shown in the diagram below. Tie a FIGURE 8 knot behind this hole Add up to 2 Thumb knots to aid in climbing. Tie Thumb knots behind this hole until all of the rope is used. REAR OF PLAYSET FOR SAFETY, ENSURE THAT THE ROPE IS TIGHT ENOUGH SO THAT IT CANNOT BE LOOPED BACK ON ITSELF.
STEP 69A: ROCK WALL ROPE 1: Use a 1" spade drill bit to drill a hole through the 2 x 4 x 47-3/8" Panel Support 12-9/16" from the left end centered vertically on the board. TIP: drill through the board until the tip of the bit just pokes through the other side. Then go to the other side of the board and drill the rest of the way through.
STEP 69A: ROCK WALL ROPE (CONTINUED) 1: Thread the Rope as shown in the diagram below. Tie a FIGURE 8 knot behind this hole. Add up to 2 Thumb knots to aid in climbing. FRONT OF PLAYSET Tie Thumb knots behind this hole until all of the rope is used. FOR SAFETY, ENSURE THAT THE ROPE IS TIGHT ENOUGH SO THAT IT CANNOT BE LOOPED BACK ON ITSELF. KEEP TYING THUMB KNOTS AT THE BOTTOM END OF THE ROPE UNTIL THERE IS NO REMAINING LOOSE ROPE. DO NOT CUT ENDS OF ROPE.
STEP 70: TELESCOPE 1: Mount Telescope as shown. DETAIL A A Telescope 2" wood screw provided with Telescope Telescope Base allowed to pivot. Snap the ends of the base into the sockets on the side of the Telescope. NOTE; IF YOU ARE MOUNTING THE LADDER ON THE REAR OF THE PLAYSET YOU WILL SEE A LADDER HERE.
STEP 71: CROWN 1: Place the Crown on top of the sun wood piece above the swing beam mount. 2: Attach the Crown to the sun with two #8 X 1-1/2" wood screws.
STEP 72: FLAG KIT 1: Place the Flags on the front of the play set centered on the corner posts. 2: Attach the plastic base of each Flag to the corner post with the 1/2" phillips head screws provided with the Flags.
STEP 73: TIC TAC TOE 1: Assemble the Tic Tac Toe panel according to the instructions in the box. IGNORE Step 6 and Step 7 in the instructions. 2: Attach the two 1-3/8" x 1-5/8" x 10-1/2" L Tic Tac Toe boards to the green plastic brackets with the 1"L phillips pan head screws provided in the Tic Tac Toe box. IMPORTANT: Make sure the Tic Tac Toe board is mounted to the green plastic bracket observing the 1-5/8" dimension shown below.
STEP 74: SAFETY HANDLES 1: Fasten the Safety Handles with the hardware that is included with the Safety Handles. 2: Fasten the Safety Handles above the Rock Wall and Ladder as shown below. Safety Handles THERE WILL BE A LADDER HERE IF YOU CHOSE TO PUT IT ON THE REAR OF THE PLAYSET. THERE WILL BE A ROCK WALL HERE IF YOU CHOSE TO PUT IT ON THE FRONT OF THE PLAYSET.
STEP 75: STEERING WHEEL 1: Place the Steering Wheel insert inside the Steering Wheel. 2: Use the 2-1/2" lag screw and washer to fasten the Steering Wheel to the end of the swing beam. Do not over-tighten the lag screw or the Steering Wheel will not turn. 3: Place the Steering Wheel Cap over the center of the Steering wheel and snap it into the Steering Wheel Insert.
STEP 76: SWINGS 1: Hang the Swing Belts and the Trapeze as shown. Adjust the swings up or down by clipping the swing chains onto higher or lower chain links.
STEP 77: GROUND STAKES 1: Hammer a Ground Stake into the earth next to each swing leg at an angle. Do not hold the upper portion of the stake after the first couple of hits or it may vibrate harshly against your hand. If the top part of the stake twists when it encounters a rock or root you may have to bend the top portion of the stake against the swing leg. Finally install the screw and washer.
STEP 78: SAFETY HANDLES - UPPER LEVEL 1: Place the Safety Handles at the appropriate height for your child centered on the inside of the middle corner posts. 2: Fasten each Safety Handle to the post with #14 x 1-1/4" pan head screws and 1/4" washers that are included with the handle.
STEP 79: PLUGS 1: Install black plastic plugs at each end of the holes shown below. 8 plugs required.
STEP 80: TUBE SLIDE 1: Build the Tube Slide according to steps 1 through 9 in the instruction manual included with the slide. 2: Rest the bottom of the slide entry upon the arched board or rock wall side top panel board. Center the slide left to right on the posts. 3: Fasten the slide entry along the sides and bottom with 1/4" x 2" lag screw and 1-1/4" fender washers. NOTE: WE RECOMMEND PREDRILLING ALL LAG SCREW HOLES WITH A 3/32" DRILL BIT PRIOR TO INSTALLING THE LAG SCREWS.
STEP 81: BOTTOM PANEL BOARD 1: Hammer a t-nut into the hole in the corner post as shown. 2: Fasten the 2 x 4 x 11" Extreme Bottom Panel Board to the corner post with a 5/16" x 41/2" hex bolt and a 5/16" washer. 3: Level the board and install a 5/16" x 3-1/2" lag screw with 5/16" washer in the last hole. 4: Repeat this process for the panel board on the other side of the slide.
STEP 82: SLATS 1: Fasten the Panel Slat on either side of the slide with a #8 x 2" wood screw.
STEP 83: LOGO PLATE 1: Place the manufacturer logo plate centered onto the front of the swing beam. 2: Fasten the logo plate with two 2" wood screws. Logo Plate Secure with 2" Wood Screws.
304 Playset Leftover Parts List Note: Due to the 300 series playsets being modular there will be some leftover parts when the playset is completed. There may also be leftover hardware pieces at the end. This is normal and should not be cause for concern.
APPENDIX 129
Chimney and Dormers Hardware Kit 8/10/2015 JH 9 #8 X 2-1/2" WOOD SCREW QTY: 2 8 #8 X 2" WOOD SCREW QTY: 4 7 #8 X 1-1/2" WOOD SCREW QTY: 14 6 #8 X 1-1/4 WOOD SCREW QTY: 6 5 4 #2 SQUARE DRIVE BIT QTY: 1 3 2 1 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS. PICTURE VIEWS SHOWN ABOVE ARE 1:1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
STEP 1: DORMER 1: OVERLAP THE LEFT DORMER SIDE ONTO THE PEAK SUPPORT OF THE RIGHT DORMER SIDE. 2: MAKE SURE THE FRONT ROOF EDGES ARE FLUSH TO ONE ANOTHER 3: FASTEN THE LEFT DORMER SIDE TO THE PEAK SUPPORT WITH #8 X 1-1/2" WOOD SCREWS. REPEAT SUBSTEPS 1-3 TO CONSTRUCT ANOTHER ROOF ASSEMBLY. #8 X 1-1/2" WOOD SCREW DORMER ROOF (LEFT SIDE) DORMER ROOF (RIGHT SIDE) COMPLETED ROOF ASSEMBLY FRONT ROOF EDGES FLUSH TO ONE ANOTHER HERE.
STEP 2: DORMER 1: PLACE THE PLASTIC DORMER SUNBURST AGAINST THE FRONT FACE SUPPORT ON THE LEFT AND RIGHT ROOF SIDES. 2: PREDRILL 7/64" PILOT HOLES BY 1/2" DEEP INTO THE ROOF SIDES AT EACH HOLE LOCATION. 3: INSTALL #8 X 1/2" PAN HEAD SCREWS TO FASTEN THE SUNBURST TO THE ROOF SIDES. REPEAT SUBSTEPS 1 THROUGH 3 TO CONSTRUCT THE SECOND DORMER. PREDRILL 7/64" HOLES X 1/2" DEEP AT EACH HOLE LOCATION ON BOTH SIDES OF THE PLASTIC SUNBURST. INSTALL A #8 X 1/2" PAN HEAD SCREW AT EACH HOLE LOCATION.
STEP 3: DORMER 1: PLACE THE DORMER ASSEMBLY ON THE ROOF AS SHOWN. 2: FOR 1500 SERIES UNITS LINE UP THE BOTTOM EDGE OF THE PLASTIC SUNBURST WITH THE LOWER EDGE OF THE 8TH ROOF BOARD. 3: CENTER THE DORMER FROM SIDE TO SIDE ON TOP OF THE ROOF. 4: ATTACH THE DORMER TO THE ROOF WITH ONE #8 X 2-1/2" WOOD SCREW AT THE REAR PEAK OF THE ROOF. ATTACH THE DORMER SUNBURST TO THE ROOF WITH TWO #8 X 1-1/2" WOOD SCREWS. REPEAT SUBSTEPS 1 THROUGH 4 FOR THE DORMER ON THE OTHER SIDE OF THE ROOF.
STEP 4: CHIMNEY 1: FIND THE FRONT AND LEFT SIDE OF THE CHIMNEY. 2: ATTACH THE FRONT AND LEFT SIDES OF THE CHIMNEY WITH A 2" WOOD SCREW. USE A 2" WOOD SCREW IN THIS LOCATION CHIMNEY FRONT CHIMNEY LEFT SIDE 1: FIND THE REAR AND RIGHT SIDE OF THE CHIMNEY. 2: ATTACH THE REAR AND RIGHT SIDES OF THE CHIMNEY WITH A 2" WOOD SCREW.
STEP 5: CHIMNEY 1: ATTACH THE CHIMNEY SIDES FROM THE PREVIOUS SIDES TO FORM THE CHIMNEY WITH 2" AND 1-1/4" WOOD SCREWS.
STEP 6: CHIMNEY 1: FASTEN THE 5/4 X 3 X 6-3/4" CHIMNEY MOUNTING BLOCK TO THE ROOF WITH #8 X 1-1/2" WOOD SCREWS. YOU CAN PLACE THE BLOCK AT ANY DESIRED PLACE ON THE ROOF. USE THE DIAGRAM BELOW AS A GUIDE FOR A SUGGESTED PLACE TO MOUNT THE CHIMNEY. 2: AFTER INSTALLING THE CHIMNEY MOUNTING BLOCK PLACE THE CHIMNEY ASSEMBLY ON THE ROOF SO THAT THE INSIDE OF THE BACK WALL RESTS AGAINST THE BLOCK. 3: FASTEN THE CHIMNEY TO THE CHIMNEY MOUNTING BLOCK WITH A #8 X 1-1/2" WOOD SCREW IN EACH SIDE.