Instructions / Assembly
59"
C
FRONT OF
LAG SCREW
B
D
ONCE YOU LEVEL AND
HOLES OF THESE BOARDS
SQUARE THE TOWER.
TOWER
A
SCREWS IN THE BOTTOM
PUT 5/16" X 3-1/2" LAG
5/16" X 3-1/2"
5/16" WASHER
DISTANCE BETWEEN
CORNER POST ON
TOWER AND CORNER
POST ON PLAY SET IS 59"
(SKIP AHEAD TO STEP 14
IF YOU NEED MORE
DETAILS ON THE 59"
DIMENSION.)
STEP 7: LAG SCREWS
1: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO
LEVEL AND SQUARE THE STRUCTURE. TO SQUARE AND LEVEL THE DECK OF THE TOWER TO THE DECK OF THE FORT
PLACE A DECK BOARD ACROSS THE 2 X 4'S. THEN PLACE A 2 X 4 X 66" BRIDGE RAIL ON TOP OF THE DECK BOARD
AND ON TOP OF THE FORT DECK. PLACE A LEVEL ON TOP OF THE 66" BRIDGE RAIL, THEN MAKE THE DECKS LEVEL
TO ONE ANOTHER.
2: ONCE THE FRAME IS LEVEL, SQUARE, AND SET INTO POSITION; GO BACK AND INSERT THE 5/16 X 3-1/2" LAG
SCREWS AND 5/16" WASHERS IN THE REMAINING HOLES OF THE 2 X 6 PARTS SHOWN BELOW. NOTE: THERE WILL NOT
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS. LAG SCREWS ARE SELF-TAPPING.
185