Instructions / Assembly

STEP 18: LEVELING THE LOWER LEVEL FRAME
1: INSTALL LAG SCREWS ONLY IN THE THREE 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME.
SQUARE EACH OF THESE THREE BOARDS TO THE LOWER LEVEL CORNER POSTS AND THEN
INSTALL THE LAG SCREWS. THIS IS TO MAKE THE STRUCTURE RIGID FOR THE LEVELING AND
SQUARING PROCESS.
2: FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO LEVEL AND SQUARE THE
STRUCTURE. DO NOT INSTALL REMAINING LAG SCREWS UNTIL AFTER THE FRAME HAS BEEN
LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT
THE 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL OF THE REMAINING HOLES OF
THE 2 X 6 PARTS ON THE FRONT OF THE PLAY SET. NOTE: THERE WILL NOT BE ANY PREDRILLED
HOLES IN THE LOWER LEVEL CORNER POSTS FOR THE LAG SCREWS.
WASHERS FIRST. THEN LEVEL/SQUARE THE
POSTS , THEN INSTALL LAG SCREWS AND
REMAINING 2 X 6 BOARDS.
FRAME. FINALLY, INSTALL LAG SCREWS IN THE
LAG SCREW
5/16" WASHER
***IMPORTANT***
SQUARE THESE THREE BOARDS TO THE CORNER
5/16" X 3-1/2"
FRONT OF FORT
74