Instructions / Assembly
END WITH 2 HOLES
SWING BEAM WITH IRON DUCTILE SWING HANGERS ATTACHED
SWING BEAM SIDE OF FORT
STEP 60: REST SWING BEAM ON FORT
1: REST THE SWING BEAM ASSEMBLY ON TOP OF THE UPPER RAILING BOARDS OF THE FORT.
2: THE END OF THE SWING BEAM WITH 2 HOLES SHOULD OVERHANG THE SWING BEAM SIDE OF
THE FORT. IN THE NEXT STEP YOU WILL ATTACH THE SWING BEAM LEGS ONTO THIS END OF THE
SWING BEAM.
117