Instructions / Assembly

SUPPORT
CORNER POST
TORQUE WASHER
4 X 4 X 96" UPPER LEVEL
CARRIAGE BOLT
3/8" WASHER
3/8" LOCK NUT
BOLT CAP
3/8" X 6-1/2"
CONNECTOR
3/8" WASHER
CONNECTOR
SUPPORT
3/8" X 5" LAG SCREW
STEP 46: UPPER LEVEL CORNER POST
1: FIND ONE 4 X 4 X 96" UPPER LEVEL CORNER POST AND FASTEN TO THE CONNECTOR
SUPPORTS USING 3/8" X 6-1/2" CARRIAGE BOLT AND TORQUE WASHER. PLACE THE CARRIAGE
BOLT INTO THE TORQUE WASHER, THEN INTO THE HOLE OF THE CORNER POST AND SET WITH A
HAMMER. USE 3/8" LOCK NUT AND 3/8" WASHER TO SECURE THE UPPER LEVEL CORNER POST
FROM THE OTHER SIDE. PLACE A BOLT CAP OVER THE EXPOSED THREADS AFTER SECURING.
2: MAKE SURE THE UPPER LEVEL CORNER POST IS PLUMB AND LEVEL IN ALL DIRECTIONS AND
SECURE USING A 3/8" X 5" LAG SCREW AND 3/8" WASHER AS SHOWN IN THE DIAGRAM BELOW.
84