Instructions / Assembly

STEP 7: LEVELING THE PLAY SET AND INSTALLING LAG SCREWS
1: LEVEL YOUR PLAY SET FRAME. LEVEL SIDE TO SIDE AND FRONT TO BACK. CHECK THE
DIAGONALS FOR SQUARE. ONCE YOU HAVE A LEVEL AND SQUARE PLAY SET FRAME YOU MAY
INSTALL LAG SCREWS.
2: INSTALL ONE 5/16" X 3-1/2" LAG SCREW WITH 5/16" WASHER INTO THE EMPTY HOLES IN ALL OF
THE SAND BOX BOARDS AND THE FRONT ARCH BOARD.
5/16" X 3-1/2" LAG SCREW
5/16" WASHER
45