Instructions / Assembly

BETWEEN THESE THREE HOLES.
NOW GO BACK AND ADD
THE 2 X 6 FLOOR BOARDS.
2-1/2" SCREWS TO THE HOLES
2 X 4 X 95-1/2"
MIDDLE FLOOR BOARD
THREE RAMP SUPPORTS INTO
WOOD SCREW
2-1/2"
2 X 6 X 95-1/2"
FLOOR BOARD
PLACE ONE 2-1/2" WOOD
SCREW ABOVE EACH OF THE
FLUSH
NOTE SCREW HOLES SHOULD BE
APPROXIMATELY CENTERED OVER THE
RAMP SUPPORTS
STEP 17: CLIMBING RAMP
1: PLACE ONE 2 X 6 X 95-1/2" FLOOR BOARD AGAINST EACH OF THE RAMP SIDE BOARDS. FASTEN THE FLOOR
BOARDS TO THE RAMP SUPPORT BOARDS WITH TWO 2-1/2" WOOD SCREWS PER SUPPORT. THE BOARDS SHOULD BE
FLUSH AT THE SQUARE END OF THE RAMP SIDES.
2: PLACE THE 2 X 4 X 95-1/2" MIDDLE FLOOR BOARD ON THE CENTER OF THE RAMP. FASTEN THE FLOOR BOARD TO
THE RAMP SUPPORT BOARDS WITH TWO 2-1/2" WOOD SCREWS PER RAMP SUPPORT.
3: ABOVE EACH OF THE RAMP SUPPORTS PLACE ONE 2-1/2" WOOD SCREW THROUGH THE RAMP SIDE BOARDS
INTO THE 2 X 6 FLOOR BOARDS. BETWEEN EACH RAMP SUPPORT, INSTALL TWO MORE 2-1/2" WOOD SCREWS
THROUGH THE RAMP SIDE INTO THE FLOOR BOARD.
57