Instructions / Assembly

SWING BEAM WITH IRON DUCTILE SWING HANGERS ATTACHED
END WITH 2 HOLES
SWING BEAM SIDE OF FORT
STEP 48: REST SWING BEAM ON FORT
1: REST THE SWING BEAM ASSEMBLY ON TOP OF THE UPPER RAILING BOARDS OF THE
FORT.
2: THE END OF THE SWING BEAM WITH 2 HOLES SHOULD OVERHANG THE SWING BEAM
SIDE OF THE FORT. IN THE NEXT STEP YOU WILL ATTACH THE SWING BEAM LEGS ONTO THIS
END OF THE SWING BEAM.
94