Installation Guide

STEP 37: ROOF PEAK
1: PLACE THE 55" ROOF PEAK ON TOP OF THE ROOF STARTER BOARDS.
2: FASTEN THE ROOF PEAK TO THE ROOF STARTER BOARDS WITH WOOD SCREWS.
55" ROOF PEAK
PREDRILL 1/8" HOLES HERE
THROUGH THE ROOF PEAK
ONLY. THEN INSTALL
TWO 1-1/4" WOOD SCREWS
ON EACH SIDE IN THE MIDDLE
#8 X 1-1/4" WOOD SCREW
69