Installation Guide
POST
5/16" X 4-1/2" HEX BOLT
5/16" WASHER
2 X 4 X 49.19 DECK SUPPORT
5/16" WASHER
LOWER
LEVEL
CORNER
5/16" X 4-1/2" HEX BOLT
INSTALL LAG SCREWS AND WASHERS.
SQUARE BOARDS TO POSTS: THEN
LEVEL
LAG SCREW
5/16" WASHER
5/16" X 3-1/2" LAG SCREW
5/16" WASHER
***IMPORTANT***
5/16" X 3-1/2"
LEVEL
HEX BOLTS
5/16" X 4-1/2"
5/16" WASHER
5/16" WASHER
MIDDLE POST
2 X 4 X 49.19
DECK SUPPORT
STEP 5: CONNECTING THE DECK SUPPORTS
1: PLACE THE 2 X 4 X 49.19 DECK SUPPORTS AGAINST THE UPPER LEVEL MIDDLE POSTS AND THE
PLAYSET CORNER POSTS UNDERNEATH THE SIDE RAIL. USE 5/16" X 4-1/2" HEX BOLTS TO ATTACH
THE DECK SUPPORTS TO THE T-NUTS INSTALLED ON THE CORNER POSTS.
2: PLACE THE UPPER LEVEL FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE
FRONT OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE. HAVE AN ASSISTANT HELP YOU
LIFT THE FRAME AS REQUIRED. DO NOT INSTALL REMAINING LAG SCREWS UNTIL AFTER THE
FRAME HAS BEEN LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT THE 5/16"
X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL THE REMAINING HOLES OF THE 2 X 6 PARTS ON
FRONT, TOP, REAR AND SIDES OF THE PLAY SET. NOTE: THERE WILL NOT BE ANY PREDRILLED
HOLES IN THE CORNER POSTS FOR THE LAG SCREWS.
103










