Instructions / Assembly

STEP 30: REST SWING BEAM ON FORT
AN EXTRA PERSON IS NEEDED FOR THIS STEP
1: SIT THE SWING BEAM LEGS UPRIGHT.
2: LINE UP THE PRE-DRILLED HOLES, AND REST THE SWING BEAM ON TOP OF THE FORT AND THE SWING BEAM LEGS.
MAKE SURE THAT YOU HAVE THE BEAM FACING THE RIGHT WAY.
LINE UP TWO HOLES
IN THIS END WITH
HOLES IN SWING LEG
BRACKET.
57