Product Brochure

A-16
How to gure the tools and materials
needed to build a Goof Proof Shower
goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof
Material estiMatorMaterial estiMator
How to figure the tools and materials
needed to build a Goof Proof Shower
Mark E. Industries, Inc.
855 Dunbar Avenue
Oldsmar FL. 34677
Phone 1-866-771-9470
Fax 813-855-2533
www.markeindustries.com
goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof
Note: Unlike Vinyl, Chloraloy and Roll-On Liners, Pre-Pitch will not
be used in this application. Quick Pitch Extra and Extended Kits
(#XFS 101.2 and #EXT 103) with Quick Clips (#QC-109) will be the
tools of choice.
1 Determine the size and s hape of your shower including the
drain location.
4 To determine the quantity of Kirb Perfect (#543) sections needed,
measure in 30" increments. Curb sections are 30" and have dove
tail connectors to attach to one another and will accommodate
all lengths and angles.
2 With the roughed-in 2 x 4 curb in place, measure the distances
from the drain to the wall opposite the drain. Measure the distance
along the length of the drain and, starting at one end, figure by
8"–12" increments.
Note: Quick Pitch Extra Float Sticks #XFS-101.2 are 36" in
length. If the distances are greater, Quick Pitch Extended Float
Sticks #EXT-103 kits will be required.
3 After determining how many Float Sticks, both Standard and
Extended necessary, you will need 2 Quick Clips (#QC-109) for
every 36" run.
5 To figure the liner size (Noble TS Sheet Water Proofing) measure
the shower compartment length and width and add 6" or what is
needed to all sides so the liner will go up the walls to a height of
3" above the shower curb on all walls and over the curb. Inside
and outside corners are necessary and are available for this
material, so be sure to figure all corners. Noble Sealant is for
Noble to Noble adhering. Each tube provides 75 linear feet (two
" beads required side by side).
6 Once you have figured the kits and liner necessary for your
Goof Proof Shower, you will need to figure the amount of
bedding mud (mixture consist of 1 part Portland cement
and 4 parts clean sand) necessary to fill the kits. Using the
square footage of your shower floor, multiply by 9.5lbs. per
sq. ft. (i.e. 3 x 5 = 15 sq. ft. x 9.5 lbs. = 143lbs.). This amount
should accommodate all kits.
7 After all materials are gathered you will want to watch the
instructional DVD a time or two to gain confidence in the steps
necessary to complete you Goof Proof Shower. (The DVD is
accessible on line 24/7.)
Constructing Your Shower Using a Linear Drain Such As Quick Drain with
Noble TS Sheet Water Proofing Membrane
Place Clips
QC-109 Quick Clip
30" 30"
Standard Quick Pitch Float Stick
Attaches to Center Ring
1"
1¾"
36"
Extended Quick Pitch Float Stick
Attaches to Standard Quick Pitch Float Stick
1¾"
2½"
36"
6"
3'
5'