Product Brochure

A-15
How to gure the tools and materials
needed to build a Goof Proof Shower
goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof
Material estiMatorMaterial estiMator
How to figure the tools and materials
needed to build a Goof Proof Shower
Mark E. Industries, Inc.
855 Dunbar Avenue
Oldsmar FL. 34677
Phone 1-866-771-9470
Fax 813-855-2533
www.markeindustries.com
goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof goof proof
3'
5'
3'
5'
6"
57"
30"
18"
27"
2½'
2½'
2½'
2½'
27"
2½'
2½'
2½'
2½'
30" 30"
Place Clips
QC-109 Quick Clip
Standard Quick Pitch Float Stick
Attaches to Center Ring
1"
1¾"
36"
Extended Quick Pitch Float Stick
Attaches to Standard Quick Pitch Float Stick
1¾"
2½"
36"
Note: Unlike Vinyl, Chloraloy and Roll-On Liners, Pre-Pitch will not
be used in this application. Quick Pitch Extra and Extended Kits
(#XFS-101.2 and #EXT-103) with Quick Clips (#QC-109) will be the
tools of choice.
1 Determine the size and shape of your shower including the drain
type and its location.
5 To determine the quantity of Kirb Perfect #543 sections needed,
measure in 30" increments. Curb sections are 30" and have dove
tail connectors to attach to one another and will accommodate
any length or angles.
2 With the roughed-in 2 x 4 curb in place, measure the distances
from the drain to the walls, curb and corners.
3 Starting in a corner, measure by 2–2½ foot increments around
the perimeter of the shower making sure a Float Stick will be
positioned in each corner.
Note: The closer the Float Stick ends are to each other, the
easier the screeding of the mud mixture will be.
4 After determining how many Float Sticks, both Standard and
Extended, are necessary, you will need 2 Quick Clips (#QC-109)
for every 36" run.
6 To figure the liner size (Noble TS Sheet Water Proofing Material),
measure the shower compartment length, width and wall height
so the liner will go up the walls to a height of the ceiling or to
where the tile ends and over the curb. Inside and outside corners
are necessary and available in this material, so be sure to figure
all corners. A Noble Flex Drain Flashing ¾" is necessary and the
desired choice. Noble Sealant is for Noble to Noble adhering.
Each tube provides 75 linear feet of sealant (two " beads
required side byside).
7 Once you have figured the kits and liner necessary for your
Goof Proof Shower, you will need to figure the amount of
bedding mud (mixture consist of 1 part Portland cement
and 4 parts clean sand) necessary to fill the kits. Using the
square footage of your shower floor, multiply by 9.5lbs.
per sq. ft. (i.e. 3 x 5 = 15 sq. ft. x 9.5 lbs. = 143lbs.). This
amount should accommodate allkits.
8 After all materials are gathered you will want to watch the
instructional DVDs a time or two to gain confidence in the steps
necessary to complete your Goof Proof Shower. (The DVD is
accessible on line 24/7.)
Note: Quick Pitch Extra Float Sticks #XFS-101.2 are 36" in
length. If the distances are greater, Quick Pitch Extended Float
Sticks #EXT-103 kits will be required.
Constructing Your Shower Using Noble TS Sheet Water Proofing Material
2' 2'
2'
2'2'
2'
2'2'