7.1 Check before Power ON
No. Check Item
1
The equipment is rmly installed in a clean place where is well-ventilated and easy to
operate.
2
Ensure that PE, the battery high voltage copper bus, the inverter power cable, the
communication cable and single phase AC cable are connected correctly and securely.
3 Cable ties are intact, routed properly and evenly.
Check the following items before power on to avoid the battery system being damaged.
7.2 Power ON
07 System Operation
Power On
31
NOTICE
Turn on QF3 when PCU is self-powered; turn on QF2 when it is using external single phase AC
powering.
Self-powered:
External single
phase AC powering: