Propane Conversion Kit Instructions
Attention Installing Personnel
As a professional installer, you have an obligation to know the
product better than the customer. This includes all safety
precautions and related items.
Prior to actual installation, thoroughly familiarize yourself with
this Instruction Manual. Pay special attention to all safety
warnings. Often during installation or repair, it is possible to
place yourself in a position which is more hazardous than
when the unit is in operation.
Remember, it is your responsibility to install the product safely
and to know it well enough to be able to instruct a customer in
its safe use.
Safety is a matter of common sense...a matter of thinking
before acting. Most dealers have a list of specific good safety
practices...follow them.
The precautions listed in this Installation Manual are intended
as supplemental to existing practices. However, if there is a
direct conflict between existing practices and the content of
this manual, the precautions listed here take precedence.
Description
This natural gas to L.P. (liquid petroleum) gas conversion kit
allows White-Rodgers gas valve 36G54 (0151F00000P), 36J54
(0151M00027) or Honeywell VR9205Q (0151M00014 /
0151M00028) to be used on L.P. gas applications.
Use the following parts list to ensure that all parts listed below
are present and in an undamaged condition. IF ANY DOUBT
EXISTS ABOUT THE CONDITIONS OF ANY COMPONENT
WITHIN THIS KIT, DO NOT USE THIS KIT AND CONTACT
YOUR SUPPLIER FOR A NEW KIT.
Contents of Kit
Part
Number
Description Quantity
0163F00000P
White-Rodgers LP Conversi on Kit F92-1008 1
0163M00139
Honeywell LP Conversion Kit 50033841 1
B14933151 Conversion Label 1
B4089955 Spud Orifice Assembly 1
IO-735* LPM-06 Installation Instructions 1
0151K00000S 36G54 Pressure Check Kit Valve 1
PARTS LIST
With the exception of the natural gas burner orifices, all of the
fasteners and other components removed to perform this con-
version are to be reused. Any component found to be dam-
aged due to this conversion must be replaced with factory
authorized replacement parts before this furnace can be put
into operation.
This furnace is equipped for two-stage heating operation. The
gas valve manifold pressure must be set with first stage oper-
ating at 6” +/-0.3” W.C. manifold pressure and the second
stage must be set at 10” +/-0.3” W.C. manifold pressure. The
accuracy of these pressures must be checked as shown in
steps 25 and 26 of these instructions.
The gas valve is equipped with a 3-pin polarized plug which
prevents this wiring from being installed incorrectly.
NOTE: Do not use power tools for any adjustments on gas
valves.
LPM-06 CONVERSION KIT
TWO-STAGE FURNACE
NATURAL GAS TO L.P. GAS CONVERSION
IO-735E
2/2015