GPG16M Installation Instructions

5
CO can cause serious illness including permanent brain
damage or death.
Advertencia especial para la instalación de calentadores ó manejadoras
de aire en áreas cerradas como estacionamientos ó cuartos de servicio.
El monóxido de carbono puede causar enfermedades severas
como daño cerebral permanente ó muerte.
Las emisiones de monóxido de carbono pueden circular a través
del aparato cuando se opera en cualquier modo.
RIS
QUE D'EMPOISONNEMENT AU
MONOXYDE DE CARBONE
Le monoxyde de carbone peut causer des maladies graves telles que
des dommages permanents au cerveau et meme la mort.
Cette ventilation est nécessaire pour é
viter le danger d'intoxication
au CO pouvant survenir si un appareil produisant du monoxyde
de carbone continue de fonctionner au sein de la zone confinée.
GENERAL INFORMATION
This unit is approved for outdoor installation ONLY. Rated performance is achieved after 20 hours of operation. Rated performance
is delivered at the specified airflow. See outdoor unit specification sheet for split system models or product specification sheet for
packaged and light commercial models. Specification sheets can be found at www.goodmanmfg.com for Goodman
®
brand products.
Within the website, please select the residential or commercial products menu and then select the submenu for the type of product
to be installed, such as air conditioners or heat pumps, to access a list of product pages that each contain links to that model’s
specification sheet.
To assure that your unit operates safely and efficiently, it must be installed, operated, and maintained in accordance with these
installation and operating instructions, all local building codes and ordinances, or in their absence, with the latest edition of the National
Fuel Gas Code NFPA 54/ANSI Z223.1 and National Standard of Canada CAN/CSA B149 Installation Codes.
The heating and cooling capacities of the unit should be greater than or equal to the design heating and cooling loads of the area to be
conditioned. The loads should be calculated by an approved method or in accordance with A.S.H.R.A.E. Guide or Manual J - Load
Calculations published by the Air Conditioning Contractors of America.
Obtain from:
American National Standards Institute
25 West 43rd Street ,4th Floor
New York, NY 10036
TRANSPORTATION DAMAGE
Check the carton upon arrival for external damage. If damage is found, a request for inspection by carrier agent should be made in
writing immediately.
Carefully inspect the unit for damage including damage to the cabinetry. Any bolts or screws which may have loosened in transit must be
re-tightened. In the event of damage, the receiver should:
1. Make notation on delivery receipt of any visible damage to shipment or container.
2. Notify carrier promptly and request an inspection.
3. In case of concealed damage, carrier should be notified as soon as possible-preferably within 5 days.
4. File the claim with the following supporting documents:
a. Original Bill of Lading, certified copy, or indemnity bond.
b. Original paid freight bill or indemnity in lieu thereof.
c. Original invoice or certified copy thereof, showing trade and other discounts or reductions.
d. Copy of the inspection report issued by carrier representative at the time damage is reported to the carrier. The carrier is
responsible for making prompt inspection of damage and for a thorough investigation of each claim. The distributor or
manufacturer will not accept claims from dealers for transportation damage.
NOTE: When inspecting the unit for transportation damage, remove all packaging materials. Recycle or dispose of the packaging
material according to local codes.