Submittal Sheet
produCt speCifiCatioNs
SS-GMVC95 www.goodmanmfg.com 5
gCVC95/9 dimeNsioNs
FOLDEDFLANGES
UNFOLDEDFLANGES
FOLDEDFLANGES
UNFOLDEDFLANGES
GCVC950714CX
21” 19½” 16⅛” 18” 19½”
GCVC950915DX
24½” 23” 20⅝” 21½” 23”
GCVC91155DX 24½” 23” 20⅝” 21½” 23”
• Installer must supply one or two PVC pipes: one for combuson air (oponal) and one for the ue outlet (required). Vent pipe must be either 2” or
3” in diameter, depending upon furnace input, number of elbows, length of run, and installaon (1 or 2 pipes). The oponal Combuson Air Pipe is
dependent on installaon/code requirements and must be 2” or 3” diameter PVC.
• Line voltage wiring can enter through the right or le side of the furnace. Low-voltage wiring can enter through the right or le side of furnace.
• Conversion kits for high-altude natural gas operaon are available. Contact your Goodman distributor or dealer for details.
• Installer must supply following gas line ngs, according to which entrance is used:
Le—Two 90º elbows, one close nipple, straight pipe
Right—Straight pipe to reach gas valve
• For boom return: Failure to unfold anges may reduce airow by up to 18%. This could result in performance and noise issues.
miNimum ClearaNCes to Combustible materials
Downow 0” 0” 3” NC 0” 1”
Horizontal 6” 0” 3” C 0” 6”
C = If placed on combustible oor, the oor MUST be wood ONLY.
NC = For installation on non-combustible oors only. A combustible oor sub-base must be used for installations on combustible ooring.
Notes:
• For servicing or cleaning, a 24” front clearance is required.
• Unit connecons (electrical, ue and drain) may necessitate greater clearances than the minimum clearances listed above.
• In all cases, accessibility clearance must take precedence over clearances from the enclosure where accessibility clearances are greater.