2. If a cooling or heat pump condensing unit is being
used in conjunction with this furnace, DIP switches
S1-1, S1-2, S1-3 are used to select the proper
cooling speeds to match the outdoor unit size.
Typical CFM requirements are 400 CFM / Ton.
3. Heating speeds are selected DIP switches
S1-4 & S2-1
1. Turn OFF power to the furnace.
2. Select the cooling blower speeds that match the instal-
or the Service Manual, If factory cooling speeds do not
match the installation requirements, the dip switch
settings must be changed from factory position
3. Turn ON power to furnace.
4. Verify proper temperature rise in heat mode and CFM
in cooling mode
120, 150, 180 seconds using the DIP switches provided on the
control module. The delay is factory shipped at 150 seconds
but may be changed to suit the installation requirements and/
switch positions and corresponding delay times.
1 2 3 4
90 OFF OFF
120 OFF ON
150 ON OFF
180 ON ON
*Factory Setting
S3
PURPOSE
Heating Fan
Off Delay
DIP SWITCH
SW I TCH
GROUP
FUNCTION
the Red LED, microcomputer runs its self-check
routine.
• The control will check the status of the gas valve
circuitry.
• Line polarity is checked.
• The control then enters standby waiting for a call
for heat or cool.
• The Furnace status LED will display a slow green
Call for 1st Stage Heat Only:
• On a call for first stage heat, the thermostat
contacts close signaling the control module.
• The microcomputer runs its self-check routine.
normal heat operation.
• The control module checks the high limit (and/
or auxiliary limit) switch(es) for normally closed
contacts.
• The control checks the low pressure switch for a
shorted condition
• The gas valve relay status is checked for proper
operation. Once the low pressure switch is detected
open, the inducer blower is energized at high speed
• The low pressure switch is checked for closure.
• Once the low pressure switch is closed, the pre-
purge period begins. The inducer will be energized
at high speed for the pre-purge period.
• Following the completion of pre-purge, the inducer
switches to low speed and the igniter warm up
period begins.
• After completion of the igniter warm up period:
a. Trial for ignition begins.
at the conclusion of the ignition activation period
begins timing.
• After the delay to heat on period, the circulator
fan is energized at the low heat speed.
• The EAC contact is energized with the circulator.
Call for 2nd Stage After First Stage:
• The inducer motor goes to high speed.
• The pressure switches are checked for closure.
Closure of the second stage pressure switch will
• The high speed circulator output is energized.
NOTE: A call for 2
nd
stage without a call for 1st stage
be displayed on the LED. This error code will only
be stored in memory once during a single power
cycle.
speed which de-energizes the second stage of the
gas valve.
is reduced to low heat speed.
stage will be ignored.