GM9S80 Installation Manual

13
peated wetting by liquids such as water (except rain
water), detergents, or sewage.
Gas line
entrance
Right side
gas entrance
(alternate)



When the gas piping enters through the side of the furnace,

the gas valve):

90 degree elbow.
Straight pipe to reach the exterior of the furnace.
󰀨
also be supplied by the installer. In some cases, the installer
may also need to supply a transition piece from ½” to anoth-
er pipe size.
When the gas piping enters through the left side of the fur-

from the gas valve):
90 degree elbow.
Straight pipe to reach the exterior of the furnace.
󰀨
must also be supplied by the installer. In some cases,
the installer may also need to supply a transition piece
from ½ inch to another pipe size.

When the gas piping enters through the left side of the fur-
nace, the installer must supply a straight pipe and a 90 de-
gree elbow to reach the exterior of the furnace.
󰀨
also be supplied by the installer. In most cases, the installer
may also need to supply a transition piece from ½” to anoth-
er pipe size. When the gas piping enters through the right
side of the furnace, the installer must supply the following





Before placing unit in operation, leak test the unit and gas
connections.




water solution, an electronic combustible gas detector, or
other approved testing methods.






pressure may cause gas valve failure.
󰀨
piping system before pressure testing the supply piping sys-
tem with pressures in excess of ½ psig (3.48 kPa).
This unit must be isolated from the gas supply system by
󰀨  
gas supply piping system with test pressures equal to or less
than ½ psig (3.48 kPa).

A gas detecting warning system is the only reliable way to
detect a propane gas leak. Rust can reduce the level of


detecting warning system. If the presence of gas is suspect-
ed, follow the instructions on Page 3 of this manual.
All propane gas equipment must conform to the safety stan-
        
Manual 58.
       

in operation. Maintaining proper gas pressure depends on
three main factors:
1.       
liquid, and “wetted surface” area of the con tainer or
containers.
2. Proper pressure regulation (Two-stage regulation is
󰀩
3. Pressure drop in lines between regulators, and between
second stage regulator and the appliance. Pipe size
will depend on length of pipe run and total load of all
appliances.