GMVC9 GCVC9 Installation Instructions
28
amount of air into the burner. This may cause incomplete com-
bustion, flashback, and possible yellow tipping.
In some areas the gas supplier may artificially derate the gas in
an effort to compensate for the effects of altitude. If the gas is
artificially derated, the appropriate orifice size must be deter-
mined based upon the BTU/ft
3
content of the derated gas and
the altitude. Refer to the National Fuel Gas Code, NFPA 54/ANSI
Z223.1 or CAN/CSA B149.1-15 in Canada, and information
provided by the gas supplier to determine the proper orifice
size.
A different pressure switch may be required at high altitude
regardless of the BTU/ft
3
content of the fuel used. Consult the
furnace Specification Sheet for pressure switch.
PROPANE GAS CONVERSION
WARNING
P
OSSIBLE
PROPERTY
DAMAGE
,
PERSONAL
INJURY
OR
DEATH
MAY
OCCUR
IF
THE
CORRECT
CONVERSION
KITS
ARE
NOT
INSTALLED
. T
HE
APPROPRIATE
KITS
MUST
BE
APPLIED
TO
ENSURE
SAFE
AND
PROPER
FURNACE
OPERATION
. A
LL
CONVERSIONS
MUST
BE
PERFORMED
BY
A
QUALIFIED
INSTALLER
OR
SERVICE
AGENCY
.
This unit is configured for natural gas. The appropriate
manufacturer’s propane gas conversion kit, must be applied for
propane gas installations. Refer to the Propane Gas and/or
High Altitude Installations for details.
Consult the furnace Specification Sheet for a listing of ap-
propriate kits. The indicated kits must be used to insure safe
and proper furnace operation. All conversions must be per-
formed by a qualified installer, or service agency.
GAS VALVE
This unit is equipped with a 24 volt gas valve controlled during
furnace operation by the integrated control module. As shipped,
the valve is configured for natural gas. The valve is field con-
vertible for use with propane gas by replacing the regulator spring
with a propane gas spring from an appropriate manufacturer’s
propane gas conversion kit. Taps for measuring the gas supply
pressure and manifold pressure are provided on the valve.
The gas valve has a manual ON/OFF control located on the valve
itself. This control may be set only to the “ON” or “OFF” posi-
tion. Refer to the lighting instructions label or Startup Proce-
dure & Adjustment for use of this control during start up and
shut down periods.
T
O
AVOID
POSSIBLE
UNSATISFACTORY
OPERATION
OF
EQUIPMENT
DAMAGE
DUE
TO
UNDERFIRING
OR
EQUIPMENT
,
USE
THE
PROPER
SIZE
OF
NATURAL
/
PROPANE
GAS
PIPING
NEEDED
WHEN
RUNNING
PIPE
FROM
THE
METER
/
TANK
TO
THE
FURNACE
.
WARNING
GAS PIPING CONNECTIONS
½
”
¾
”
1
”
1¼” 1 ½”
10 132 278 520 1050 1600
20 92 190 350 730 1100
30 73 152 285 590 980
40 63 130 245 500 760
50 56 115 215 440 670
60 50 105 195 400 610
70 46 96 180 370 560
80 43 90 170 350 530
90 40 84 160 320 490
100 38 79 150 305 460
CFH = BTUH Furnace Input _______
_
_________
Heating Value of Gas (BTU/Cubic Foot)
Natural Gas Capacity of Pipe
In Cubic Feet of Gas Per Hour (CFH)
Nominal Black Pipe Size
Length of
Pipe in Feet
(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on
0.60 Specific gravity Gas)
The gas piping supplying the furnace must be properly sized based
on the gas flow required, specific gravity of the gas, and length
of the run. The gas line installation must comply with local codes,
or in their absence, with the latest edition of the National Fuel
Gas Code, NFPA 54/ANSI Z223.1 or CAN/CSA B149.1-15.
To connect the furnace to the building’s gas piping, the installer
must supply a ground joint union, drip leg, manual shutoff valve,
and line and fittings to connect to gas valve. In some cases, the
installer may also need to supply a transition piece from 1/2"
pipe to a larger pipe size.
The following stipulations apply when connecting gas piping. Re-
fer to Gas Piping Connections figure for typical gas line connec-
tions to the furnace.
• Gas piping must be supported external to the furnace
cabinet so that the weight of the gas line does not
distort the burner rack, manifold or gas valve.
• Use black iron or steel pipe and fittings for building piping.
Where possible, use new pipe that is properly chamfered,
reamed, and free of burrs and chips. If old pipe is used,
be sure it is clean and free of rust, scale, burrs, chips,
and old pipe joint compound.
• Use pipe joint compound on male threads ONLY. Always
use pipe joint compound (pipe dope) that is APPROVED
FOR ALL GASSES. DO NOT apply compound to the first
two threads.
• Use ground joint unions.
• Install a drip leg to trap dirt and moisture before it can
enter the gas valve. The drip leg must be a minimum of
three inches long.
• Install a 1/8" NPT pipe plug fitting, accessible for test
gage connection, immediately upstream of the gas supply
connection to the furnace.