Installation Manual

32









1. Allow the system to remain Idle for 5 minutes.
2. Turn the system verication test on either by using
the phone application, or by entering the SUt menu
through the furnace push buttons.
3. Wait for the test to complete.

1. Inverter units using the  HVAC phone
application or control board push button:
a. Inverter units are charged by setting
the CR9 menu (Charge Mode) to ON through
the furnace control board push buttons
or through the HVAC phone
application.
b. The System will remain in charge mode (high
speed) for 60 minutes before timing out.
c. The installer must manually shut o󰀨 charge
mode once complete.
2. Two-stage outdoor units using the HVAC
application:
a. Using the cooling icon after entering the outdoor
unit menus, energize the outdoor unit at 100%
capacity.
b. Charge the outdoor unit as required using the
charging information provided with the outdoor
equipment.

1. Two-stage Operation using the  HVAC
application:
a. Select the gas heat icon after entering the
furnace menus.
b. Select any value less than 50% for low stage
operation and any value greater than 50% for
high stage operation.
4. Conrm thermostat heating and cooling calls function
proprly with equipment.






IdL


instructed by the applicable wiring diagrams shown in
this section.
2. Connect the 1 & 2 wires between the indoor and
outdoor unit for communicating operation.
Note: verify two stage outdoor units include a 24 VAC
transformer (for outdoor control board power) Two
stage outdoor units may not behave properly without
this 24 VAC transformer.
R
C
G
Y
Optional
Optional
Optional if
feature
supported by
thermostat








1
2
C
R
C
G
Y
1
2
C



1
2
C
R
C
G
Y
Optional
Optional
Optional






1
2
C
R
C
G
Y





3. Download the HVAC phone application for
charging and to congure/test system operations.





