GC9C96 Installation Manual
21
Secure the trap to the cabinet using two screws
Hose #11
Hose #2
Minimum 5 ½” clearance is required for the drain trap
beneath the furnace.
*Also see Front Cover Pressure Switch Tube Location on
page 11
Secure the trap to the cabinet using two screws
Hose #6
Hose #5
Hose #11
*Also see Front Cover Pressure Switch Tube Location on
page 11