GC9C80 Service Manual

SYSTEM OPERATION
9
W2 W/W1 R G C Y/Y1 Y2
24V HUM
Terminal is
energized when
pressure switch
is closed
24 VOLT HUM.
& HUMIDISTAT



On a call for heat, the thermostat contacts close & the
control board receives 24 VAC on the W1 terminal.
The control board microcomputer runs its self-check
routine.
The control veries the limit switch is closed (24 VAC on
Pin 8 of the 12 Pin connector).
The control veries that pressure switch circuit is open
(0 VAC on Pin 5).
The control module performs a gas valve circuitry check
to verify gas valve relay state and presence of voltage
at the valve.
The system will energize the Induced draft blower.
The pre-purge period begins once the low re pressure
switch is detected closed (24 VAC on Pin 5).
After the completion of pre-purge, the control will
energize the igniter.
After completion of the ignitor warm-up period:
The gas valve is energized.
The ignitor is de-energized as soon as ame is sensed.
After 30 seconds the indoor blower is energized on
heating speed.
When using a single-stage heating thermostat, the
furnace will transition to 2nd stage gas heat by either a
xed time or auto mode depending on menu selections
made by the installer.
The inducer motor is enabled at high speed.
Closure of the 2nd stage pressure switch will energize
the high re stage of the gas valve.
The 2nd stage gas heat speed of the indoor blower is
energized
When the thermostat is satised:
The gas valve is de-energized.
The inducer remains energized for the post purge period
(15 seconds).
The indoor blower runs for the selected o󰀨 delay period
(90 seconds by default, adjustable from 30 – 180
seconds).

The control board receives a 24 VAC signal on the W2
terminal.
The inducer motor is enabled at high speed.
Closure of the 2nd stage pressure switch will energize
the high re stage of the gas valve.
The 2nd stage gas heat speed of the indoor blower is
energized.

To change the main blower speed in HEATING mode, follow
the following steps:
Press the left or right switch until LED displays “gA1”
(for single-stage HEATING) or “gA2” (for two-stage
HEATING). Press the center switch and LED will display
the selected speed number as Fxx (xx: Blower speed
number).
The control will rotate available speed number every time
left / right switches are pressed. The table below shows
the available speeds for low & high heat mode.
Press the center switch to save the selection.
 Always refer to the Heating Chart to choose from
available heating speeds
THERMOSTATCALL AVAILABLESPEEDS
W/W1
F01(DEFAULT)
F03
F04
W2
F02(DEFAULT)
F04
F05


To change the main blower speed in circulation mode, follow
the following steps:
Press the left or right switch until LED displays “FSd”. Press
the center switch and LED will display the selected speed
number as Fxx (xx: Blower speed number from 1 to 9).
F03 is the default speed for circulation.