CSCF R-22 Service Manual
SYSTEM OPERATION
29
DEFROST CYCLE
The defrosting of the outdoor coil is jointly controlled by the
defrost timing board, defrost (30/60) control, and compressor
run time.
Solid State Defrost Control
During operation the power to the circuit board is controlled
by a temperature sensor, which is clamped to a return bend
(3/8" coils) or a feeder tube (5 mm coils) entering the outdoor
coil. Defrost timing periods of 30, 60, or 90 minutes may be
selected by connecting the circuit board jumper to 30, 60, or
90 respectively. Accumulation of time for the timing period
selected starts when the sensor closes (approximately 31°
F), and when the room thermostat calls for heat. At the end
of the timing period, the unit’s defrost cycle will be initiated
provided the sensor remains closed. When the sensor opens
(approximately 75° F), the defrost cycle is terminated and the
timing period is reset. If the defrost cycle is not terminated
due to the sensor temperature, a ten minute override inter-
rupts the unit’s defrost period. The new upgraded defrost
control has a 12 minute override interrupt.
W2 DFT
DF1
DF2
90
60
30
HEATING CYCLE
The reversing valve on the heat pump models is energized in
the cooling cycle through the "O" terminal on the room
thermostat.
These models have a 24 volt reversing valve coil. When the
thermostat selector switch is set in the cooling position, the
"O" terminal on the thermostat is energized all the time.
Care must be taken when selecting a room thermostat. Refer
to the installation instructions shipped with the product for
approved thermostats.