HAVE YOU DISCUSSED WITH YOUR INSTALLATION INSTALLING CONTRACTOR THE OPTIONAL § 300.00 2 THROUGH & OPERATING 5™ YEAR COMPRESSOR LABOR INSTRUCTIONS [A eas ony CK SERIES CONDENSING UNIT Goodman Manufacturing Co., LP.
IMPORTANT MESSAGE TO OWNER: These instructions should be carefully read and kept near product, for future reference. While these instructions are addressed primarily to the installer, useful maintenance information is included. Have your installing dealer acquaint you with ihe operating characteristics of the product and periodic maintenance requirements, CODES AND REGULATIONS This product is designed and manufactured to permit install elation in accordance with National Codes.
the condensing unit as well as control wiring between thee mortal, indoor unit and the condensing unit. All wiring must be in accordance with National Electrical Code and/or focal codes that may apply. (See unit wiring diagram furnished with this instruction). The condensing unit rating plate and the table inside the front cover of this instruction lists pertinent electrical data necessary for the selection of proper size electrical service and over-current protection.
The following are instructions on the field connection to the valve and the naive opening procedure. (1) Tubing should be cut square. Make sure it is round and free of burrs at the connecting ends. Clean the tubing to prevent contamination from entering the system. (2y Wrap a wet rag around the copper valve stub before brazing. {3) Braze or silver solder the joint. {4) After brazing quench with a wel rag to cool the joint.
CHECKING CHARGE CAPILLARY TUBE / FIXED ORIFICE SYSTEM 1. Fully open both base valves. 2. Connect service Gage manifold to base-valve service pins being sure to purge lines, Run system at least 10 minutes to allow pressure to stabilize. 3. Temporarily install thermometer on suction (large) fine near condensing unit. Be sure of good contact between thermometer and line. Wrap thermometer with insulating material to assure accurate reading. 4. Refer to Table 2 for proper system super heat.
EXPANSION VALVE SYSTEM 1. Fully open both base valves. 2. Connect service Gage manifold to base-valve service parts being sure fo purge fines. Run system at least 10 minutes to allow pressure io stabilize. 3. Temporarily install thermometer to liquid (small) line near condensing unit. Be sure of good contact between thermometer and line. Wrap thermometer with insulating material to insure accurate reading. 4.