CAPFA Installation Guide

4
8. AFTER THE TAILPIECE HAS COOLED, conrm posion of the
white Teon
®
seal and hand ghten the 13/16 nut.
9. Torque the 13/16” nut to 10-20 -lbs. or 1/6 turn past hand
ght.
10. Replace sucon line grommet and insulaon.
9.6TubingConneconsforTXVVersion
TXV models come with factory installed non-adjustable TXV
with the bulb permanently located on the sucon tube.
1. Remove coil access panel.
2. Remove access valve ng cap and depress the valve stem
in access ng to release pressure. No pressure indicates
possible leak.
3. Replace the refrigerant tubing panel.
4. Remove the spin closure on both the liquid and sucon tubes
using a tubing cuer. DO NOT USE A CUTTING METHOD THAT
WOULD RESULT IN THE GENERATION OF COPPER SHAVINGS
OR COPPER DUST.
SUCTION
LINE SET
SUCTION
TUBE
RUBBER
GROMMET
Figure 5.1
LIQUID
LINE SET
LIQUID
LINE
RUBBER
GROMMET
Figure 5.2
5. Insert liquid line set into liquid tube expansion and slide
grommet about 18” away from braze joint.
6. Insert sucon line set into sucon tube expansion and slide
insulaon and grommet about 18” away from braze joint.
7. Braze sucon and liquid line joints.
10. SupplyDuctConnecon
1. Top anges can be bent for ease in installaon to the duct
anges. (See Figure 6)
Unfolded View
Top Flange Detail View
F
I
L
L
E
R
P
L
A
T
E
F
I
L
L
E
R
P
L
A
T
E
Figure 6