ASPT Service Manual

Table Of Contents
SERVICING
83
Blower Performance Data
󰀩
The motor is a one piece, fully encapsulated, 3 phase
brushless DC (single phase AC input) motor with ball
bearing construction.
1. Using a voltmeter, check for 230 volts to the motor
connections L and N. If 230 volts is present, proceed to
step 2. If 230 volts is not present, check the line voltage
circuit to the motor.
2. Using a voltmeter, check for 24 volts from terminal C to
either terminal 1, 2, 3, 4, or 5, depending on which tap is
being used, at the motor. If voltage present, proceed tostep
3. If no voltage, check 24 volt circuit to motor.
3. If voltage was present in steps 1 and 2, the motor has
failed and will need to be replaced.


proper drip loop to prevent condensate from entering
the motor.
SP EED STATIC
MBR800**-*
SCFM
MBR1200**-*
SCFM
MBR1600**-*
SCFM
MBR2000**-*
SCFM
0.1 1,240 1,500 1,800 2,160
0.2 1,170 1,460 1,740 2,080
0.3 1,120 1,360 1,680 1,990
0.4 1,060 1,280 1,610 1,890
0.5 980 1,200 1,520 1,790
0.6 900 1,110 1,430 1,690
0.1 900 1,380 1,540 1,730
0.2 850 1,320 1,490 1,670
0.3 790 1,270 1,450 1,590
0.4 740 1,200 1,400 1,520
0.5 680 1,140 13,560 1,420
0.6 605 1,040 1,280 1,320
0.1 650 1,170 1,130 1,520
0.2 590 1,130 1,100 1,450
0.3 540 1,080 1,070 1,360
0.4 500 1,020 1,030 1,290
0.5 430 950 990 1,200
0.6 330 830 930 1,090
HIGH
MEDIUM
LOW
C
L G N
1 2 3
4
5
High Voltage
Connections
3/16"
Low Voltage Connections
1/4
Motor Connections
