DOOR PANEL INSTALLATION
mbedding box positioning.
E
The upper part of the door panel should be placed at 1,65m. height roughly. The hole dimensions
willdependonthetypeofdoorpanel.
The door panel has been designed to be placed under most of the environmental conditions.
However it's recommended to take additional cautions like rainproof covers. To obtain a good
qualitypictureonvideodoorentrysystems,avoiddirectincidencefromlightsources.
reparing the cables entry.
P
Break the bottom flange to pass the cables through. In case of door panels
with more than one embedding box, break the side flanges and
attach the embedding boxes using UC junctions.