Operation Manual

122
LOCK RELEASE INSTALLATION
nstalling the FA-PLUS and FA-PLUS/C power supplies.
I
DIN 46277
3,5 x 25
DIN-7971
3,5 x 25
DIN-7971
M 4 x 8
3,5 x 25
DIN-7972
DIN-963
POWER SUPPLY INSTALLATION
ock release installation.
L
Replace the protection cover once the input terminals have been wired.
It'srecommendedtoprotect the power supply by using a
thermo-magnetic circuit breaker. Use a ground
connectionwithFA-Pluspowersupply.
To install the power supply directly on the wall, drill two holes of
Ø6mm. and insert the wallplugs. Fix the transformer with the
specifiedscrews.
The power supply can be installed on a DIN 46277
guidesimplypressingit.
To disassemble the power supply from the DIN guide,
use a plain screwdriver to leverthe flange as shown
onthepicture.
TheFA-Plus/Cmodel uses 6 units over DIN guide and
10unitstheFA-Plusmodel.
IMPORTANT: the maximum number of units that can be connected to a FA-Plus/C power supply is
10, and 50 units in case of a FA-Plus model. Link power supplies to connect more
unitsthanthespecifiedasit'sshownonpage136.
If the lock release will be installed in a metal door, use a
Ø3,5mm.
drillandtapthehole
.Incaseofwooddoor,useaØ3mm.drill.
IMPORTANT:thelockreleasemustbeof12Vd.c.ora.c.
Seepage136(a.c.lockreleases)andpage137to148(d.clockreleases)
Installthepowersupplyinadryandprotectedplacewithoutriskofdriporwaterprojections.
To avoid an electrical shock, neither remove the primary protection cover nor handle the connected
wireintheterminals.
The installation and handling of these equipments must be performed by authorised personnel and
withoutthepowerconnected.
Toavoiddamage,thepowersupplyhastobefirmlyfixed.